Loading...
Gateway BP(1.3)-CS 990701 (2)COPPELL STREETS DMSION DATE: TIME: TO: FROM: RE: July 1, 1999 9:00 a.m. Larry Davis, Construction Inspector Brent Adams, Streets Division Walk-thru Gateway Business Park 6/30/99 Listed below are Street Division comments relative to 1. e walk thru. Fritz/Freeport - ADA rout and seal at curb returns. 1'~ driveway on Fritz from Freeport-seal curbs at saw joints and curb returns. e Driveway off Freeport - seal curb returns & saw ~oints in curbs. 4. ADA ramp at Gateway/Freeport - seal curb returns. 5. Move stop sign closer to intersection. 6. 1't driveway off Freeport on Gateway - seal curbs; patch bad spot west side of drive at Redwood header. 2"d driveway off Freeport on Gateway - seal curbs. All problems m~rked in white paint. MESSAGE CONF I RMAT I ON B?/01~99 12:05 ID=CITY OF COPPELL DATE 07/01 S,R-TIME DISTANT STATION ID MODE PAGES 00'51" CiTY OF COFPELL CALLING 03 RESULT OK