Gateway BP(1.3)-CS 990701 (2)COPPELL STREETS DMSION
DATE:
TIME:
TO:
FROM:
RE:
July 1, 1999
9:00 a.m.
Larry Davis, Construction Inspector
Brent Adams, Streets Division
Walk-thru Gateway Business Park 6/30/99
Listed below are Street Division comments relative to
1.
e
walk thru.
Fritz/Freeport - ADA rout and seal at curb returns.
1'~ driveway on Fritz from Freeport-seal curbs at saw joints
and curb returns.
e
Driveway off Freeport - seal curb returns & saw ~oints in
curbs.
4. ADA ramp at Gateway/Freeport - seal curb returns.
5. Move stop sign closer to intersection.
6. 1't driveway off Freeport on Gateway - seal curbs; patch bad
spot west side of drive at Redwood header.
2"d driveway off Freeport on Gateway - seal curbs.
All problems m~rked in white paint.
MESSAGE
CONF I RMAT I ON
B?/01~99 12:05
ID=CITY OF COPPELL
DATE
07/01
S,R-TIME DISTANT STATION ID MODE PAGES
00'51" CiTY OF COFPELL CALLING 03
RESULT
OK