Loading...
Gateway BP(1.4)-CS 970409COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM DATE: April 9, 1997 TO: Garreth Campbell FROM: Larry Smith, Utilities RE: Walk thru for Haverty's A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. April 4, 1997 8. 9. 10. Lock and Hasp needs to be placed on both Vaults. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg RE: Walk thru for COPP~.r.r. ENGIN~JNG UT~.rl~.~ DIVISION bo~4ORANDUM A walk-~ru on :he above referenced projec: was conducted on ~nd ~he i~ms below were found ~o be deficient. Please ensure that these items g~t micro car~ of and it' you have nny questions, please