Gateway BP(1.4)-CS 970409COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM
DATE: April 9, 1997
TO: Garreth Campbell
FROM: Larry Smith, Utilities
RE: Walk thru for Haverty's
A walk-thru on the above referenced project was conducted on
and the items below were found to be deficient.
April 4, 1997
8.
9.
10.
Lock and Hasp needs to be placed on both Vaults.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/dg
RE: Walk thru for
COPP~.r.r. ENGIN~JNG
UT~.rl~.~ DIVISION
bo~4ORANDUM
A walk-~ru on :he above referenced projec: was conducted on
~nd ~he i~ms below were found ~o be deficient.
Please ensure that these items g~t micro car~ of and it' you have nny questions, please