Gateway BP(1.5)-CS000707 (2) MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Garreth Campbell, Construction ln~ector Engineexing
! ~rry Morton, Stree~ Division
July 7, 2000
Walk-thru Advanced Graphics (Gateway Bus. Pk. Lot 2R Blk 2)
1. Reinstall No Parking signs 2' behind curb with new concrete b~e.
1. Seal up area where new RCP connects to inlet box-both inlets on Gateway.
CITY OF COPPEI~ PUBLIC lgOl~$ DEPARTMENI'
MESSAGE
CONF I RMAT I ON
07×07x00 10: 5~
ID=CITY OF COPPELL
DATE
09/09
S,R-TIME DISTANT STATION ID
80'39" CITY OF COPPELL
MO~ ~S ~S~T
C~LI~ 02 ~ ~00
214.
The Cily With A Beautiful Fu~m
Co~d, ~
Joly 3, 2000
Mr. Robert E. M~7~m, HI
Irving, Tex~
Final Walk-thru
Plea.se be advised that a ~nik41m~,h am bern ~ for Tlnn'M~, July 6, 2000 ~ 9:00 for
d~ wa~r, sanitary sewer, paving and dr~i,,'~e_, facilit~ in th~ refum:~d pmje~.
Please ensure that all facilit~s are clean and acc~si~ie at that time and that comrn__~__r's
representatives are present to as~iat with the inspection.
Your coopt-ration in this effort is greatly apprec!~_. If you should have any questions, please
call 972-304-3685 at your e~rliest convenience.
Sincerely.
CC:
Debi Ingrain, En~ineesin~ Secretax~
Glenn Hollowell, Director of l~blic Works
Greg Jo~, Chief ~;n~ Offic~
~ Sm~. CO~ ~
Pacific Builders (~: 21~3~8~11)
HalffAss~. 1~. (~: 21~73~