Gateway BP(1.5)-CS000719 (2) MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To-'
Garreth Campbell, Construction Inspector Engineering
Danny Itightower, Utilities Division
July 19, 2000
Follow-up Walk-Thru Advanced Graphics
1. All O.K.
CITY OF COPpEI~ pUBLIC ~VORK$ DEPARTMENF
MESSAGE
CONF I RMAT I ON
09/19/~ 14::32
ID--CITY OF COPPF-LL
DATE
09/19
S,R-TIME DISTANT STATION ID MODE PAGES
00'21" CITY OF COPPELL CALLING 01
RESULT
OK 0000
07× 11 ×00
FROM ~
DEPARTMENT OF PUBLIC WORKS
16:49 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL
10:51 CITY ~ CO. ELL ~ CITY C;~ CDPPELL
Danuy Itightow~r, Utifitim Divi~o~
July % ~00
Walk.thru Advanced Geq~hie~ (C, atoway Bm.Pk. Lot ~g BIk 2)
N0.~86
MLV-need pad on valve stack east side of buimln~,
Dom. & Irfig. Need ball valve I~uta on DC 2'%
ln~. - DC 2" n~d baO valves turned up.
Vault - need bali valve pluzs hrle & small (~ vaults) inside.
Need vault blocking under wheel valve (3 vaults) inside.
Paint all MLV blue.
pMnt all FIt & 1~%' ~d on curb.
Fit valve N.E. of buiJdiag needs Y ext,.
MLV ,alve N.F.. o~ buBdin~ needs Y extn.
Need to replace broken valve stark lind S.W. of buildi~ on F.IL & MLV.
Vault needs ground irouud it lowered for draimge.
DOM..Meter loop (bypass open at this time) close bypass, ~ ~