Loading...
Gateway BP(2.5)-CS 990623 (2)COPPELL STREETS DIVISION DATE: TIME: TO: FROM: RE: June 23, 1999 9:00 a.m. Garreth Campbell, Construction Inspector Brent Adams, Streets Division Walk-thru Gateway Business Park Lot 1,Blk C,G & K Listed below are Street Division comments relative to walk thru. 1. East Driveway: rout & seal everything marked with white paint new concrete to existing pavement & random cracks. 2. Center driveway: rout & seal new concrete to existing pave- ment. West driveway: rout & seal new concrete to existing pavement. Seal around storm sewer patch. o MESSAGE CONF I RMAT I ON 06,'2~/99 11: 1~) ID--CITY OF COPPELL ['HTE S, ~' qr I ME D [STAHT STAT ION ID MODE PAGES RESULT i [TY OF C:OPPELL CALLING 02 OK 01100