Loading...
Gateway BP(2.5)-CS 980723coPPELL. TEXAS 75019 Larry Baker G & K Scrv/ces, Inc. $99S Opus Parlmay Gateway Business Park (G & K Services, inc.) Development Fee Assessment PO Rox 478 Cop~ell. Texas 75019 972..362.0022 July 23, Dear Mr. Baker: Enclosed is a copy of thc City of Coppell Development Fee Assessment table, aloug with a copy of the Development Fee 'calculations for the referenced development. Please make pnyment to the City of Coppell in the amount of $/2, l:53~68_a~d ferward m the Finance Deparnnent along wi& a copy of the Fee Assessment talkie. This amount is a portion of the assessed fees which need m be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or conuact to our office so the construction i~pection fee ~an be verified. Providing a copy of your paid receipt to the Engiileering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me giich~ef A. Martin, P.E, Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services ~0~ 816'0N ]]BddOD ~0 XllD ~ 9NISBBNIgNB ]]BddOD JO ~£I} :r0 8E'91t~r I, EVELOPMENT FEE TABL Project: C~eway Business Park (G & K $er~ees, l~c.) Date: 7/23/98 ' " TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due. prior to Council A, pproval) Water Tap Inspection Fee $200.00 (100% due at las-artec of Water M,e, ter) , Water Meter Fee (Domestic) (100% due at Is?~-~nc~ of Water Meter) t~ I, tO z, SO Water Meter Fee (ln-igation/Fireline) $5.956.65 (I00% due at lss-~nce of Water Meter) Water Meter Depo.~it (Domestic) $35.00 (100% due at ,Isso_n_n_¢e of Water, Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Iss-nnce of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due,prior to Co-,,c!!,,.A,,pproval) Wastewater Tap Inspection Fee $50.00 (100% due at Issunnce of Building Permit.) . _ Utility Final Inspection Fee $50,00 (~00% due at Is*-~nce of Buildm..g Permit) ,,. -Park Fee $0.00 N/^ (100% due,.prior to Council Approval) Roadway Impact Fee $53,028.68 $53,028.68 (100% due prior to COuncil Approval) , .... I SUeet Light Fee Infmmation not (100% due prior to Act~,e.?ante of Project available at thia time Street Sign Fee Information not (100% due prior to A, cceplance of Proj,ect available at this Construction Inspection Fee Ne~d ~ubmimt of development contrac~,, TOTAL $78,535.33 ~oTAL AMOUI~IT DUE PRIOR TO, COUNCIL APPROVAL , $72,153.68 £0d 816'0N 993dd03 30 AllD ~ 9NIa33NIgN3 393ddOD 30 A£ID :t:,O 86,9I " L,_VELOPMENT FEE WORKSHr~ET PROJECT: Gatew~ B,,s~ne;s I'=rk ((; & & Ser~i~;~, Inc.) DATE: ?/23/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 3 inch = 16 ESU's 1 - 2 inch -- ' 8 ESU'$ = ESU's 2 - 8 inc~ = 2.5 ESU's Total #: 26.5 ESU's O $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap [aspecfion Fee: Total #: 4 Connections ~ $50.00 ea. (Single family due ixior to issuance of building i~ermit) (AJI other developments due prier to issuance of meter) Domestic Water Meter Fee: ~ ! I0 ~, Total It: 1 Domestic Meter(s) O ~ (Single family due prior to issuance of building per, nit) (NI other developments due prior to issuance of meter) lrrigatioa/Firelb~e Water Meter Fee: Tetal ~ t Irrigali~ Meter(s) ~ $192.15 Tetal #: 0 Ad~litio~aJ Irrigation Meter(s) ~ TeteJ #: 2 Fireline Meter(s) Q . $2,882.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Mete~(s) ~l ~35.00 ea. (100% due pr~' to issuance of water meters) Irrigation/FiFe Meter Deposit Fee: Total #: 3 Meter(s) Q ~0.00 (~ua prior to issuance of water metem) War,water Impact Fee: Total Domestic Meters ESU's:. $11,925.00 ._. $200.00 S192.15 ss.? .~.so .... $35.00 $90.00 16 ~$450.00 ea. $7,200.00 ._. Wastewater Tap Inspection Fee: Tot~l ~. I Co~flect~ns ~ $60.00 ea. (100% due ~ to Issuance of building I~'~mit) Utility Final Inspection Fe~ (All developments): Total It: t Lots ~ $50.00 ea. (100% due prior to issuance of building per~it) $50.00 $50.00 P~e3 pO~l 8T6'ON ]]BddOD -~0 A±ID ~ DNItlBBNI~NB ]]BddOD JO /,J-ID :,~] 86,,91 t~[ L,~:VELOPMENT FEE WORKSH,-'ET Perk Fee (For Residential Development~ Only): * Preliminary plat approved prior to June 23, 1992: NIA N/A Smile-family ~ $150.00 / Lot Multi-family ~ $75.001 Unit (50% paid prior to Cmmcil approval of final plat) (50% paid at issuance of bulMiflg pam~it) * Preliminary pht approved after June 23, 1992: N/A N/A _ Single-family ~ S350,00 1 Lot Multi-family O $350,001 Unit "(50% paid prior to Council approval of rmal plat) (50% paid at issuaflc.,e of building permit) * Prelimiuary pht approved after October 26, 1993: N/A Single-family ~ $1285.00 / Lot N/A "Multi-family ~ $1285.00 1 Unit - (t00% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's dgl~t-~f-way. This fee cannot be assessed until after T,U, Elecblc suDmits the IIgAfing plan for the proposed developmenL Once the plans are submitted, $292.60 par light will be assessed. (100% duo prior to final acceptance of development) N/A ~A N/A $53,028.68 ln~o~tto~ ava~abl~ al Street Sip Fees: A.~sessed for signage in the City's right, of-way. (See attached fee calculations if applicable) a~J~ble at ~ t~e Construction Inspection Fees: A copy of the development contract must tM submitted for assesement. The contracts should indicate the cost to conelr~Jct the improvements that am inspected by tho Engineering Department, (2% of development cost required for private improvements) (4% of development cost required for public Improvemeflla) Need submit~l af developmem co~.._~_ Page 4 S0~ 8~6'0N 33BddO} ~0 A£ID ~ DNI~BBNI~NB ]]3ddOD ~0 A±I} , :~:)0 86/9I DI ROA.. WAY IMPACT FEE CALCULA · ~ONS DATE: ROADWAY IMPA~T s vi= Am · to ! ~,x4 Use ** ~ / Not S~ ~d~) ~ Unit~ **,, 67.7~ V~ M~ ~ ~el~ U~t ** 2.61 V~h~ ~ ~ ~c~,~t) x ~ ~ V~l~ ~e) = S~3,~.68 * ~igu~ 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway lmpa~t F~ Study) *** (Scl~dule 2, Page 3 - Roadway Impact Fee Study) This fe~ i~ eligible for up m · 50~ credit do to the orlgh~aI developer commuting l.~k~hote & Ct~,st~id~ Drives. To Receive this credit a letter from the original developer needs to bc submitted assi~ing some of thc credits for this development. 214-304-3545 / / WATER TAP / METER INSP. FEE .~ )~j~. SEWER TAP INSP. FEE UTILITY FINAL INSP. FEE SECURITY DEPOSITS-WATER ~ ~ ~ WATER / SEWER SERVICE SALES WATER M~ER SAL~ REVENUE WATER TAP FEE SEWER TAP FEE CUSTOMER SERVICE INSPE~ON ~C~LOW DEVICE REGIST~TIOH BACKFLOW DEVICE TESTED REGIST~TION METER TEST FEE 1 ~ 4 3/~. ~ ~ ~ TOTAL~ ~ Received By MESSAGE CONF I RMAT I ON 10 20~98 07:32 ID--CITY OF COPPELL DATE 10/2D S,R-TIME 00'47" DISTANT STATION ID MODE PAGES RESULT CITY OP COPPELL CALLING O1 OK 0000 AIK::HITECTUIIAL UTIUTIE$, INC. G~IERAL CONTRACTORS 300 WEST RAMSEY P.O. BOX 11586 FORT WORTH, TX 76110 · 817-926~377 429~191 METRO 817-926~387 FAX OVERTON BANK & TRUST NATIONAL ASSOCIATION 76109 ----.-;~[~111_.%. 9-0CT-1~9~ 107009 01 07009 Six Thousm~d Ni!~e ~'L,~dred Twe~*~t>,-Fo~r Oo;i).~,rs and 75 Cents ARCHITECTIJRA/I~ES INC. PAY TO THE ~~. ORDER ~'~ OF C~ppe11, TX MESSAGE CONFIRMATION 10/~0/98 11:57 ID=CITY OF COPPELL DATE S,R-TIME DISTANT STATIOII ID 00'20" CITY OF COPPELL MODE PAGES CALLING 01 RESULT OK 0000 P.O. BOX 255 P~AY BI~.VD. COFtn'g~ ~l ~ 't'X ?i~DI9 FAX NO. (972) ENGINEE~G DEPARTMENT FAX COVER SHEET TO: FIRM: FAX NO.: FROM:~ --- ., PHONE NO.:_ -- DATE: TRANSMITTED BY: TIME: N'UMBER OF PAGES (INCLUDING COVERSHEET): IF YOU DO NOT REC'F. XV~ ALL OF THE PAGES, PLEASE CALL (972) 304=3679. [0~ 816'0N 993ddOD JO AlID ~ 9NI~BBNI~NB ~93ddOD JO AIID :~,~ 86,91 ~[