Gateway BP(2.1)-CS010716 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
Larry Morton, Streets Division Public Works
July 16, 2001
Follow-up Walk-thru Gateway Business Park Lot 2 Block A
Rems 1 & 3 on initial walk-thru are OK.
Item 2: nothing has been done - still holding water.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
07/15/0i 09:33
ID:CITY OF COPPELL
DATE
07/i6
S,R-TIME DISTANT STATION ID MODE PAGES
00'25" CITY OF COPPELL CALLING 01
RESULT
OK 0000
MF~MORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
RE:
Garreth Campbell, Construction Inspector gn~neering
I any Morton, Streets Division Publk Works
June 26, 2001
Walk-thru Gateway Business Park H Lot 2 Block A
Clean approaches so they can be checked.
Ia~ge water pond in west approach needs to be repaired or rephced.
Backf'dl behind curb-water eroding under street.
CI'I'Y OF COPPELL PUBLIC P/Ol~$ DEPARTMENT