Gateway BP(2.1)-CS010709 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To.*
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
July 9, 2001
Follow-up Walk-thru Gateway Business Park H, Lot 2 Blk A
Still need paperwork on one 2" irrigation meter.
Up-charge due for two 2" meters - to be billed to Tri Dal.
CITY OF COPPELL PUBLIC IFOPJ~$ DEPARTMENT
MESSAGE CONFIRMATION
07×09/01 11:~?
ID=CITY OF COPPELL
DATE
0?/09
S,R-TIME DISTANT STATION ID
00'20" CITY OF COPPELL
MODE PAGES
CALLING O1
RESULT
OK 0000
MEMORANDUM
FROM THF
DEPARTMENT OF PUBLIC WORKS
To: Garreth Campbell, Construction Inspector Engineering
From: Danny Hightower, Utilities Division Public Works
Date: June 26, 2001
RE: Walk-thru Gateway Business Park H, Lot 2 Blk A
1. Valve to vault not in working order.
2. b~'Cut dirt down around 2 vaults for drainage.
3. ~ Vaults need lock latch on top door 2 vaults.
4. L~-DC's in vault & DC on 2 domestic & 1 irrigation need pings.
5. ~per wor~on ~-'-l~C--~s 2 ~-aults 8~", 2 d~, 1 irrig' 2"' ~
6. I~'~Inside vaults need blocking under valves.
7. ~,,/~Inside vaults needs to be graded around pipes to vault.
8. b/Need blue buttons on street for all FH.
9. V/ Cut 24" X 24" around all valves in concrete & seal cuts.
10. ~Fant side of building MLV not worklm,, cannot turn on or off.
16.
Fire Dept. FDC needs caps.
Turn FH toward street (FH at entrance to building).
Paint MLV in front of building blue (its red at thi~ time).
Vaults must be dry inside--cannot check for leaks with water over pipes.
Repair broken vault door on east side of build|rig.
Plans call for one 3" domestic meter not two 2" meters.. Check with Glenn Hollowell,
Public Works, at Deforest Serwce Center, for up-charges for~Y\L/~
AgsLstant
Director
of
Mark on curb m red WAD. '~J~'
Paint manholes and WAD lid red.
WAD needs rain pan.
~//Clean meter can and DC can below fitting to cheek for leaks.
CITY OF COPPELL PUBI.[C WORKS DEPARTMENT
~.hzzica4, ~CmM C. Tq~ D.C~,,