Loading...
Gateway BP(2.1)-CS010501DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Water Impact Fee: ~Domestic Meter(s): Irrigation Meter(s): Gateway Business Park No. II, Lot 2 Block A 5/1/01 i - 3 inch Fireline Meter(s): = 16 ESU's -,1.-,-3--i¢¢cfi~ = 8 ESU's = 0 ESU's inch = 2.5 ESU's Total #: 26.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: Domestic Water Meter Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other, developments due prior to issuance of meter) 1 Domestic Meter(s) @ $1,098.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: i Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.05 $0.00 $3,217.20 Domestic Water Meter Deposit Fee: Total #: i Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) ;~! F ~ - ~'~ Wastewater Impact Fee: ~ Total Domestic Meters ESU's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: i Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: i Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page i DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 DEVELOPMENT FEE WORKSHEET $11,925.00 $200.00 $1,098.83 $192.05 $0.00 $6,434.40 $35.00 $90.00 $7,200.00 $5O.OO $50.00 Page 3 DEVELOPMENT FEE WORKSHEET $0.00 $o.oo $3:~,005.59 Information not Available Information not Available Information not Available Page 4