Loading...
Gateway BP(2.1)-CS 990420 972 304 3570 10:37 ~ 'TY OF COPPELL ENGR. DEPT. e SRU ! N0.204 ~01 -~IT ASSESBHENT 4/7.0/99 4/20/90 DEVELOPMENT FEES Halff AssoOates AS~sSED FEE AMOUNT PA~D DATE P~K Fee Water Impact Fee WastewaCer Impac~ Fee $11,925.00 $11,925.00 7/6/00 S7,200.00 $7,200.00 7/6/00 S~eet Sign Street Light notify street dept. Construc':Jon Inspection $12,920.oo $12,920.00 7/14/00 Roadway Impact-Zone 10 $31,005.Sg $31,005.59 7/6/00 Street Cut Permit Overtime Ins _lL~ect__ion Water Tap Ir~pec~on Wastewater Tap Inspection Water Meter (Domestic) Water Meter (FJre/Zrrig) Meter Deposit (Domestic) Meter Deposit (Fire~rrig) Utility Rnal Inspection TOTALS $120.00 $120.00 11/13/00 $100.00 S100.00 8/1/00 $6,434.40 $6,434.40 8/t/O0 $60.00 $60.00 8/1/00 Total Fees Fees Paid Amount Owe~ $$9~764.9g $59,764.99 $0.00 Prior To Conb'trucUo~t ~oslon ContTol Approved E,P.A,-N.O.L Recd. Const. Plan Approved Irrigation Plan Recd, Prior To final Accel~anc~ As Built Plan Recd. Paving Bond Recd. UUIItles Bond Recd. ImgaUon Plan Approved Erosion Control Maint. 5573 HALFF AS$OC ~ooz M~y 16, 2001 17419 City of Coppell 255 Parkwn¥ Blvd. Copp¢ll, Tcxaa 75019 Fax: 972-304-3570 P~: Gateway One Dear Sir/Madam: Bgsed oll the |nformation provided by the MEP for the pzoj¢cl, the '~-2 inch domestic wat¢~ m~ters installed in parallel arc adea:luate to s,:rv¢ the project. We will incorporate ti'tis into the record drawings at Se end of the proj,:ct. If you have any questions, comments, or require any additional information plessc contact mc. 20001. T-T64 P.~z/O~ F'-961 ~ M4kk, ~oo! L~yo~ ,,*vt eny qundon* a, ~,~-..-..~ pbue bt a',, M ~1 ~ st (214) 82L3800 x200. BT/cT