Gateway BP(2.1)-CS 990420 972 304 3570
10:37 ~ 'TY OF COPPELL ENGR. DEPT. e SRU ! N0.204 ~01
-~IT ASSESBHENT
4/7.0/99
4/20/90
DEVELOPMENT FEES
Halff AssoOates
AS~sSED FEE AMOUNT PA~D DATE
P~K Fee
Water Impact Fee
WastewaCer Impac~ Fee
$11,925.00 $11,925.00 7/6/00
S7,200.00 $7,200.00 7/6/00
S~eet Sign
Street Light
notify street dept.
Construc':Jon Inspection
$12,920.oo $12,920.00 7/14/00
Roadway Impact-Zone 10
$31,005.Sg $31,005.59 7/6/00
Street Cut Permit
Overtime Ins _lL~ect__ion
Water Tap Ir~pec~on
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (FJre/Zrrig)
Meter Deposit (Domestic)
Meter Deposit (Fire~rrig)
Utility Rnal Inspection
TOTALS
$120.00 $120.00 11/13/00
$100.00 S100.00 8/1/00
$6,434.40 $6,434.40 8/t/O0
$60.00 $60.00 8/1/00
Total Fees Fees Paid Amount Owe~
$$9~764.9g $59,764.99 $0.00
Prior To Conb'trucUo~t
~oslon ContTol Approved
E,P.A,-N.O.L Recd.
Const. Plan Approved
Irrigation Plan Recd,
Prior To final Accel~anc~
As Built Plan Recd.
Paving Bond Recd.
UUIItles Bond Recd.
ImgaUon Plan Approved
Erosion Control Maint.
5573 HALFF AS$OC
~ooz
M~y 16, 2001
17419
City of Coppell
255 Parkwn¥ Blvd.
Copp¢ll, Tcxaa 75019
Fax: 972-304-3570
P~: Gateway One
Dear Sir/Madam:
Bgsed oll the |nformation provided by the MEP for the pzoj¢cl, the '~-2 inch domestic wat¢~
m~ters installed in parallel arc adea:luate to s,:rv¢ the project. We will incorporate ti'tis
into the record drawings at Se end of the proj,:ct.
If you have any questions, comments, or require any additional information plessc contact mc.
20001.
T-T64 P.~z/O~ F'-961
~ M4kk,
~oo!
L~yo~ ,,*vt eny qundon* a, ~,~-..-..~ pbue bt a',, M ~1 ~ st (214) 82L3800 x200.
BT/cT