Loading...
Freeport NIP(7.1)-CS000926 214 304 35?0 ~, 15:51 CI~~ I~ COPPELL ENGINEERING -* CITY OI~ ]PPELL N0.702 1~01 MEMORANDUM FROM THE DEPARTM~.NT OF ENGINEERING To: aFom~ Mike Mar~m, AJsL City Engineer Glean Hollowell, Director of Public Works (;rea jo_,~s~Char lJuild~ Omchl W~LK-THRU for Freeport Parkway, Bldg. VI, Lot 3, Block A 0LoysJ Lane ~ Creek-view) A final wfflk-thru for street~, utilities end drsJnage on the refeFeaced project has been scheduled for Wednesday, October 4, 2000 at 8:30 a.m. Ill can be of fuFther tolerance plesse kt me know. Lee Stone, Commercial Inspector Mike Worley, Mm & Wilkinsou (fax 214-299-4444) Cbris Jackson, Hm & V~dkinson (bx 214-299-44~) Amy BFaddock, Cdllar Corot. (fu 972-838-2299) Potter Concrete (f~x 214-689-1066) 'CITY OF COPP~LL SNGINEERING - rXC~LLL'qCE BY DESIGN"