Freeport NIP(7.1)-CS000926 214 304 35?0 ~,
15:51 CI~~ I~ COPPELL ENGINEERING -* CITY OI~ ]PPELL N0.702 1~01
MEMORANDUM
FROM THE
DEPARTM~.NT OF ENGINEERING
To:
aFom~
Mike Mar~m, AJsL City Engineer
Glean Hollowell, Director of Public Works
(;rea jo_,~s~Char lJuild~ Omchl
W~LK-THRU for Freeport Parkway, Bldg. VI, Lot 3, Block A
0LoysJ Lane ~ Creek-view)
A final wfflk-thru for street~, utilities end drsJnage on the refeFeaced project has been
scheduled for Wednesday, October 4, 2000 at 8:30 a.m.
Ill can be of fuFther tolerance plesse kt me know.
Lee Stone, Commercial Inspector
Mike Worley, Mm & Wilkinsou (fax 214-299-4444)
Cbris Jackson, Hm & V~dkinson (bx 214-299-44~)
Amy BFaddock, Cdllar Corot. (fu 972-838-2299)
Potter Concrete (f~x 214-689-1066)
'CITY OF COPP~LL SNGINEERING - rXC~LLL'qCE BY DESIGN"