Gateway BP (1.1)-CS 970331DATE:
TO:
FROM:
RE:
COPPELL ENGINE,~,RING
UTILITIES DIVISION
MEMORANDUM
March 31, 1997
Garreth Campbell
Larry Smith, Utilities
Walk thru for
Gateway Business Park Block 2. Haverty$
A walk-thru on the above referenced project was conducted on
and the items below were found to be deficient.
2.
3.
4.
5.
6.
7.
8.
9.
10.
March 31. 1997
Check all Fire Hydrants (flowed). Ail fire hydrants are ok.
Please send me a copy of your Punch list we spoke about on this walkthru.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/dg
COPP~.Lx. ENGIN~.k'allNG
l. yrw~rl.~ ~,~ DIVIS'ION
I~'WlORANDUM
DATE:
TO:
FROM:
A wa.Lk-thr~ on the above referenced project was conducted on
a~d the items oe. ow were ~bund to be deficient.
Please ensu~.e that these items get ~ c~e of and if you have any questions, plea.se