Loading...
Gateway BP (1.1)-CS 970331DATE: TO: FROM: RE: COPPELL ENGINE,~,RING UTILITIES DIVISION MEMORANDUM March 31, 1997 Garreth Campbell Larry Smith, Utilities Walk thru for Gateway Business Park Block 2. Haverty$ A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. 2. 3. 4. 5. 6. 7. 8. 9. 10. March 31. 1997 Check all Fire Hydrants (flowed). Ail fire hydrants are ok. Please send me a copy of your Punch list we spoke about on this walkthru. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg COPP~.Lx. ENGIN~.k'allNG l. yrw~rl.~ ~,~ DIVIS'ION I~'WlORANDUM DATE: TO: FROM: A wa.Lk-thr~ on the above referenced project was conducted on a~d the items oe. ow were ~bund to be deficient. Please ensu~.e that these items get ~ c~e of and if you have any questions, plea.se