Loading...
Highland Meadows-CS 901221DATE= TO~ FROM= RE= COPPELL P~BLIC WORKS MEMORANDUM December 21, 1990 Steven G. Goram, Director of Public W~ Rey Gonzales, Street Superintendent Highland Meadow Subgrade Failure Tickler 12-18-90 This project is substantially complete. The only item remaining is approximately 3' to 5' of area that needs concrete poured. When we poured the trench we were short approximately 1/2 yard of concrete. Tickler 1-18-90 RG/mp HIGHLAND.RG