Loading...
Gibbs Station 2-AG 930608CONSElq~ AGE~B)A AGENDA ]REQUEST FORM ~CIL MIAR'T]NG Jnne 8, 1993 I~ NUMBF..R ~ ITEM CAPTION: Consideration and approval of a Final Plat of Gibbs Station Addition, Phase II, located along the east side of liacArthur Boulevard near Parkway Boulevard, at the request of Heath and Knight Properties. SUBM['I-rED BY: EVALUATION OF ITEM: Planning Director. Gary L. Sieb STAFF RJEP.: OTHER REP.: DATE: Date of Planning Co~ssion Heeting: Hay 20, 1993 Decision of Planning Commission: Approved (6-0) with the follo~nE conditions: 1. 20 foot front yard building line on Lots 1-5, Block G; 2. 55Z lot coverage; 3. 5 foot side yard side building line (~aterior lots) 4. 62 foot minimum lot width on Block G, Lots 105; and 5. a letter be obtained from~UD approving the existing ~ line, or that they address the issue and get it resolved. Please see attached staff report for further N/A ~1'. BUDGET AMT. AMT +/-BUDGET LEGAL REVIEW BY: REVIEWED BY CITY OF COPPELL PLANNING DEPARTMENT GIBBS STATION ADDITION. PHASE II - FINAL PI-,AT P & Z HEARHqG DATE: IViay 20, 1993 C. C. HEARING DATE: June 8, 1993 LOCATION: Along the east side of MacArthur Boulevard near Parkway Boulevard. SIZE OF AREA: 27.689 Acres of land. C~ ZONING: PD-121 (SF-7) Approval of a final plat. APPLICANT: Heath & Knight Propertiez (Oeveloper) Mr. Hammond Heath 1600 D~lln~ Parkway Suite//1400 Dallas, Texas 75248 (214) 248-9190 Dan Dowdey & Associates ( neer) Mr. Bill Anderson 16250 Dallas Parkway Suite #100 Dnlh.% Texas 75248 (214) 931-0694 HISTORY: A preliminary plat for this tract of land has been approved by City Council. TRANSPORTATION: MacArthur Boulevard is shown as a six-lane divided thoroughfare (P6D), contained within a 100' right-of-way, it is preseatly a four-lane divided roadway. Allen'Road is a local street. SURROUNDING LAND USE & ZONING: North - single-family use & park land; SF-0 zoning South - future single-Pamily use; SF zoning ~:a~t - future single-family use; SF zoning West - future single-family use; SF zoning COMPREI~-NSIVE PLAN: The Comprehon~ive Plan ~ows low den~i~ ~ingle-family u.~ for th~ al'~L ANALYSIS: When this item was presented to the City Council for review, four stipulmtlons were attached to the approval of the plat, which relmted to the 35% P.D. stipulation. They were: 1) 2) 3) 4) 20 foot front yard building line; 55% lot coverage; 5 foot side yard side building line (interior lot~); 62' minimum lot width In addition to the other normal SF-7 development guidelines, a p~o-~dsion that prospective buyers be provided a single l~ge 8-1/2" X 11' sheet disclosing the existence of the homeowners association, indicating the tax rate at the time, and this be pwvided to them at the time the earnest money contract on the home is executed, wa~ required. Also, a letter from the Munidpal Utility District (MUD) concerning the existing 27" MUD line between Ya~Arthur Boulevard and Viil~!e Staff would recommend approval of this plat subject to the stated condition~. 1) Approve the final plat 2) Deny the final plat 3) Modify the final plat ATI~ACHMENTS: 1) Final Plat gibbs.stf