Loading...
Highland Meadows-CS 850814GINN, INC. CONSULTING ENGINEERS August 14, 1985 Mr. Tom Wise Univest Development Co. 12770 Cott Road, #1215 Dallas, Texas 75251 Re: Highland Meadows -- Final Acceptance Dear Mr. Wise: A final inspection of the above referenced project was conducted on August 13, 1985. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. As of this date, permits can be issued to start construction of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (August 14, 1986). Sincerely, H. Wayne Ginn, P.E. RF/HWG/sr cc: Steve Goram Dean Youngblood Mike Boney Fred Ivey Randy Fleming Contractors: J. C. Boney Construction Co., Inc. P.O. Box 59485 Dallas, TX 75229 243-2348 American Developers & Contractors, Inc. 2521 East Main Street Grand Prairie, TX 75050 263-8884 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/'386-6611