Loading...
Gateway BP (1.1)-CS 950222The City With A Beautiful Future February 22, 1995 P. O. Box 478 CoppelI, Texas 75019 214- 462-0022 FAX 214- 393-0948 Mr. Pat Acker Halff and Associates 8616 North Plaza Drive Dallas, ~Texas 75225 RE: Freeport Parkway Sanitary Sewer Line Repairs Dear Mr. Acker: As per our discussion regarding the repairs that need to be performed on the Freeport Parkway Sanitary Sewer Line, you had asked me to prepare a quote for city staff to make these repairs. Attached you will find a quote for two point repairs and clean-up of the entire system. If the owner of the development wants the work performed by city staff, please have a check cut for the amount listed and the work will be completed within 60 days. If you have any questions regarding this matter, please contact me at 304-354 ~~~rSi erely, Utilities Su ~tendent HLP/dg City of Coppell Water Utilities REPAIR QUOTE Point Repair # 1 Sta. 0+00.00 Line "B" 1 - Crewleader 12 hrs. 2 - Maintenance Workers 12 hrs. Repair Materials all Backhoe time 6 hrs. Shoring Box @ 13.00 hr. @ 9.00 hr. @ 50.00 hr. @ 35.00 hr. @ 100.00 all Total Cost Repair #1 Point Repair # 2 Sra. 4+00 Line "A" 1 - Crewleader 8 hrs. 1 - Maintenance Worker 8 hrs. Repair Materials (Grout) Grouting Unit 2 hrs. Entry Equipment 3 hrs. @ 13.00 hr. @ 9.00 hr. @ 150.00 all @ 100.00 hr. @ 50.00 hr. Total Cost Repair ~2 Cleaning of System i - Crewleader 1 - Maintenance Worker Vactor Unit 8 hrs. @ 13.00 hr. 8 hrs. @ 9.00 hr. 6 hr.s @ 45.00 hr. Total Cost for Cleaning $ 156.00 216.00 50.00 210.00 100.00 $ 732.00 $ 104.00 72.00 150.00 100.00 150.00 $ 576. O0 $ 104.00 72.00 270.00 $ 446.00 Total Repair and Cleaning Cost $1,754.00