Loading...
Highland Oaks-CS 860106GINN. INC. ENGINEERS January 6, 1986 Mr. David Pickett Pickett Investments 1919 South Shiloh Road, Suite 320 Garland, Texas 75042 Re: Highland Oaks Final Acceptance Dear Mr. Pickett: A final inspection was conducted on December 23, 1985 for the above referenced project by representatives of Ginn, Inc. and the City of Coppell. All items to the project are in compliance with the standards set forth by the City of Coppell subdivision requirements and are found to be acceptable to both parties. built drawings and one-year maintenance bonds have been received from both parties with a maturity date of January 1, 1987. Sincerely, Randy Fleming cc: Ed Powell, P.E., City of Coppell Steve Goram Per Birdsall Jim Pitts Treece & Company