Loading...
CF-Cozby Library-LR051104Rone Engineering CLient: Project: 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 /~.~_...~ Corporate Phone: (214) 630-9745 .cONCRETE COMPRESSIVE STRENGTH TEST ci, of Ms. S~ff~i Moino P~Box 9478 WT Cozby Public Library 177 N Heartz Coppell, Texas Report No.: 244076 Project No.: 0510866 Date of Service: 10/26/2005 Report Date: 11/04/2005 Obtain samples of fi'ash concrete at the plac~nent locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: H-B Construction, Inc. CONCRETE SUPPLIER: LMC PLANT: NA SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CYLINDER MARKED 3000 psi ~ 28 Days 4" - 6" NA ASTM C-172 ASTM C-31 *~v~ ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 SAMPLE LOCATION: ASTM C-39 C~[~Comf~ve Cylinder 6"x 12" DAT AGE DIAMETER AREA SET NO. TESTED (days) (inches) (sq.in.) 1 1 11/02/2005 7 6.00 28.26 MIX DESIGN 1.D.: NA PLACEMENT DATE: 10/26/2005 WEATHER CONDITIONS: Sunny TIME SAMPLED: 3:03pm BATCH TIME: NA TEMPERATURE (F) - AIR 72 F CONCRETE: 76 F TRUCK NO: NA TICKET NO: NA AIR CONTENT (%): NA OVERALL pLACEMENT LOCATIO¢/ Piers A/I 2, M12.9, and D/14.1 Same as MAXIMUM COMPRESSIVE LOAD STRENGTH Obs. force) (psi) 69170 2450 1 2 11/23/2005 28 0.00 1 3 11/23/2005 28 0.00 1 4 Hold Water added at site: 5 gallons ee Report %244075 for technician time. o.oo 0.00 ,~ / MEASURED SLUMP (inches) 6.0 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap Technician: Paul Leigh Report Distribution: (1) City of Coppell (i) City of Coppell (l) City of Coppell (1) H-B Construction, Inc. Started: Finished: CMT Operations Manager one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Sherri Moino PO Box 9478 Coppell TX 75019 Report No.: 243983 Project No.: 0510866 Date of Service: 10/25/2005 Report Date: 11/04/2005 Project: WT Cozby Public Library 177 N Heartz Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: CONCRETE SUPPLIER: Image Concrete pLANT: WH SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" - 7" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 H-B Construction, Inc. MEASURED MIX DESIGN I.D.: 13501 SLUMP PLACEMENT DATE: 10/25/2005 (inches) WEATHER CONDITIONS: Sunny 7.75 TLMESAMPLED: NA BATCHTIME: 3:57pm TEMPERATURE (F) - AIR 69 F CONCRETE: 74 E TRUCK NO: B TICKET NO: 0 AIR CONTENT (%): NA UNITWEIGHT(pcl): NA OVERALL PLACEMENT LOCATION: Piers (see ReporL #243982) SAMPLE LOCATION: C/13.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE SET NO. TESTED 1 1 11/01/2005 1 2 11/22/2005 1 3 11/22/2005 MAXIMUM COMPRESSIVE AG.~i~IAMETER AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) ~ ~ J (inches) TYPE ,~/ 6.00 28.26 62280 Unbonded Cap 28 0.00 0.00 Unbonded Cap 28 0.00 0.00 Unbonded Cap 1 4 Hold See Report ~243982 for technician time. Technician: Paul Leigh Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (l) H-B Construction. Inc Started: Finished: K. Sci t Watson, AET CMT O )erations Manager Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Ms. Sherri Moiao PO Box 9478 Coppell TX 75019 Report No.: 243921 Project No.: 0510866 Date of Service: 10/24/2005 Report Date: 11/04/2005 WT Cozby Public Library 177 N Heartz Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: CONCRETE SUPPLIER: LMC PLANT: 1 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5"- 7" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 H-B Construction, Inc. M~X OESIGN LD.: 3274 PLACEMENT DATE: 10/24/2005 WEATHER CONDITIONS: Sunny TI~IESAMPLED: 4:40pm BATCHTIME: 3:33pm TEMPERATURE (F) - AIR 71 F CONCRETE: 74 F TRUCK NO: P~ TICRET NO: 1373648 AIR CONTENT (%): NA vNrr WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Piers SAMPLE LOCATION: Same as above REPORT OF TESTS MEASURED SLUMP (inches) 4.0 Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE SET NO. TESTED I 1 10/31/2005 1 2 11/21/2005 1 3 11/21/2005 MAXIMUM ff IAMETER AREA LOAD (inches) (sq.in.) (lbs. force) 6.00 28.26 75540 0.00 0.00 ~ 28 0.00 0.00 1 4 Hold Water added at site: 10 gallons COMPRESSIVE STRENGTH FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap See Report #243920 for technician time. Technician: Paul Leigh Report Distribution: (1) City of Coppell (i) City of Coppell (i) City of Coppell (1) H-B Construction, Inc. Started: Finished: CMT Operations Manager