Gibbs Station 2-CS 940118 (3)The City With A Beautiful Future
JAN ! 9 1994 IDI
PUBLIC WORKS
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Craig Knight
Heath and Knight
16660 Dallas Parkway, Suite 1400
Dear lVlr. Knight:
A final inspection of the above-referenced project has been confirmed by representatives of the
City of COl~ell subject to thc various maintenance agreements.
The paving and utilities have been verified and are in compliance with the City of Coppell's
standard requirements. Erosion protection will also be maiptnlned until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion
Control Bond will be two years from this letter.
Consuuction Inspector
Kenneth M. Griffin, P.E., City Engineer
Howard Paffo Wa r Superintendent
Rey Gonzales, Street Superintendent
Greg Iones, Building Official
Doug Stevens, Engineering Technician
Bill Jones, L.H. T u~ey
Chuck Young, C.W. Young Construction