Loading...
Gibbs Station 2-CS 940118COPPKLL PUBLIC WORKS D~TE: FROM~ RE: January 18, 1994 //[~~// Larry Davis,Construction Inspector Howard Pafford,Utilities Super~ntenden~ 2nd Follow-Up Walk-Through on Gibbs Station Phase II Utilities personnel performed a 2nd follow-up walk-thru on the above referenced project and found the following items to be deficient at this time. * Once the wall and sidewalk contractor have completed their projects, it will be necessary to insure that all water and sanitary sewer components are at grade and operational. Please insure that these items are addressed prior to acceptance of this project. HLP/hlp WALKTHRU.GIBBSII.HLP DATE: TO: FROM: RE: COPPELL PUBLIC WORKS January 10, 1994 Larry Davis, Construction Inspector Howard L. Pafford, Utilities Superintende Follow-Up Walk-Through on Gibbs Station Utilities personnel performed a follow-up walk-through on the above referenced project and the following items remain deficient: /a~l.~'q."~-'Manhole at STA//12 + 90.31 Line B - Bottom band on chimney seal needs tightened. Also needs a rain pan. C~,c2~/5/<~, Sta #1 + 63.70 - Manhole chimney seal needs reset and dirt cleaned out of 'bottom. Set chimney seal after grouting in and outside of ring. ~3~)~ STA gO + 00 Ln B - Remove bucket inside manhole - tighten bottom band. 7 4. Valves in pavement at Gibbs Crossing and Village Parkway need 2' x 2' blockouts, not street cuts. Repair at both ends of street. ~x.~5~. Lots 1- 4 Block D - Dirt contractor needs to he brought back to repair existing ~.) lot clean outs and existing meter service can. "'"~c~ "-~ ~- ~.,~----6 Wall contractors need to uncover and expose existing manholes and water ~/?'-~ ~-'~e~ ' valves on MacArth. ur easeCent. ~ ~,.xising mainline valve at Lot 6 Block B needs stacked and hole filled in and "-~' - pad repoured. 14 Block #.- Sewer clean out is missing. Manhole at Sm//2 + 50 Ln D - Tighten bottom band on chimney seal. Please ensure that these items are corrected prior to acceptance of this project. HLP/dm WALKTHRU.HLP/GIBBSII The City With A Beautiful Future F. O. Box 478 CoPlXll. Texas 75019 FAX MAIL COVER PAGE p~TRLIC WOI~KS DEPT. 732 DEFOREST RD. P.O. BOX 478 COPPELL, TEXAS 75019 FAX ~ (214) 393-7648 PLEASE DELIVER PAGES TO: FIRM: FAX~: NUMBER OF PAGES OUR FAX~ 214-393-7648 (INCLUDING COVER SHEET) .~ *If you do not receive all of the pages, please call back as soon as possible. Telephone No~(214) 462-8495 and ask for person sending this fax. TIME MESSAGE CONFIRMATION DATE: 01/85/94 ID: TX-TIME DISTANT STATION ID MODE ~'44" 214 39'{ B948 G3-S PAGES TIME: 14:01 RESULT ~ ' ! ~.%{' COPPELL PUBLIC WO ./.-~ TO: Steven G. 6oram, Dir~tor of Public Works ~OM: How~d L Pafford, Utilities Su~fintendent RE: W~k-~rough/Punchlist for Gibbs Station Phase II ~a~r/S~i~ Sewer) Water Ufihfies ~rsonnel have ~fform~ a w~k ~ough of the above referenced The following items were found to be deficient during the walk through. ~O~anhnle at sm It 2 + 50 Ln D - Tighten bottom band on chimney s~-----T~ '~)/~Manhole gt Sta # 17 + 25.87 Ln B - ~ateral entering manhole inverted. ~'~- /~anhole at Sta # 12 + 90.31 Line 1S - Bottom band. on chimney seal needs~o~//~c&  Sta # 5.100 Ln C - End manhole lateral entering in inverted. B - Lateral entering manhole in inverted. Manhole chimney seal needs reset and dirt cleaned out ~d"~ S-ta~0 + 00 Ln B - Remove bracket inside manhole.-. ~.~/~t~,--._bo~/o,~ ~ Valves in pavement at Gibbs Crossing and Village Parkway need 2'xff~ ~,.~'~' hloc:kouts not street cuts. Repair at both ends of street.~ ~ Fire Hydrant at Block A Lot 17 and 16 needs to he lowered. 11~. Valve at Bums Crossing and Village Parkway needs pad repoured. ~~,L.," Blow-off on Round Rock Circle needs 90" turned up .... ots 1- 4 Block D - 15irt~6htractor needs to be bi'oaght back to repair existing ~ .-:.~ .... *o ~d ~g meter _~e.'-.'i~ all need to uncover and expose existing manholes and w~_~ contractors alves on MacArthur ea~~ " e fille~-d in an~'"d'~ xisting maifiline valve at Lot 6 Block B needs stacked and hole filled in ana~ reinsured. __ __.____-- Please ensure tidal ~cl; of t~c~;:~ kc.n;,,; a,c ~ acceptance of this project. HLP/dm WALKTHRU.HLP/GIBBSII 0EI1 PO. ~nx C~ppell, Texas 7r3019 PI~K&SE DKLIVKR 'I'HK I~OLO~IHG PAGe8 TI~B~LI. TYKI) BY: #L~BSR OF I)AG~S (IIGLm)IIG COV~ s~:) . 12/22/93 17:219 CITY OF ~1 ~2 To: MEMO Howard Pat'ford, Water Utilities Superintendent Re,/Oonzales, Strcet Supettntcndent Troy Olid~w~ll, Pire Marshal Keflneth M. Griffin, P,~., City Engineer Doug Stevens, Bnginccrin8 Technician Larry Davis, Construction Inslx~orkbbj t~e.. FINAL WALK-TH~U - Gibbs $~alion Phase Il December 22, 1993 A flnat walk-thru on the above listed project ha~ been requested for Tue~tay, Decemb~r~28th, 1,3 for ~:30 a.m. for pavir~g and tltiliti,. If I can b~ of further assistance, please' Jet mc know. ChuckYoung, C.W. Young Conmtrucfion Cra/g Knight, Knight-Ii~ath Oarrcth Campbcll, Constnlction lnslx:ctor fllotldavis/fltmlwlk.thr To: From: RE: Date: MEMO Howard Pafford, Water Utilities Superintendent Rey Gonzales, Street Superintendent Troy Glidewell, Fire Marshal Kenneth M. Griffin, P.E., City Engineer Doug Stevens, Engineering Technician Larry Davis, Construction Inspectorkb/d p~0.__ FINAL WALK-THRU- Gibbs Station Phase II December 22, 1993 A final walk-thru on the above listed project has been requested for Tuesday, December 28th, 1993 for 8:30 a.m. for paving and utilities. ~ ~L ~x~_~ If I can be of further assistance, please let me know. Bill Jones, L.H. Lacy ChuckYoung, C.W. Young Construction Craig Knight, Knight-Heath Garreth Campbell, Construction Inspector file/ldavis/finnlwlk.thr