Gibbs Station 2-CS 940118 (2)COPPBLL PUBLIC WORK~ FROM~ January 18, 1994 Larry Davis,Construction Inspector Howard Pafford,Utilities Superintenden~ 2nd Follow-Up Walk-Through on Gibbs Station Phase II Utilities personnel performed a 2nd follow-up walk-thru on the above referenced project and found the following items to be deficient at this time. * Once the wall and sidewalk contractor have completed their projects, it will be necessary to insure that all water and sanitary sewer components are at grade and operational. Please insure that these items are addressed prior to acceptance of this project. HLP/hlp WALKTHRU.GIBBSII.HLP