Park West CC(02-2)-LR051110ENVIP, ONt4ENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Park West Commerce Center
Belfline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 127
REPORT DATE: 11-10-05
REG PROJECT NO. 12468
DATE OBSERVED: 10-28-05
TECHNICIAN: F. Gomez
PAGE: I of 1
Items Observed:
Pavement between Buildings A and B from center of fire
lane 60'E to 60'W and from pavement limit to 350'S.
Reference Plans or Notes Used: [ Sheet C5.1
~---~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail Submitted by:
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr, Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/mg
2424STUTZ DR." SUITE400 · DALLAS, TX 75235 · TEL[214]3505600" F^X [21413500019