Loading...
Park West CC(02-2)-LR051107I:=1 IE~ffi'r-~ I E I--I r'-~ I I'--I E~ I~: I~1 I1--1 E~ GEOTECHNICAL AND ~ ~ ~-1 L-J F~ ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 64 REG PROJECT NO. 12468 SAMPLE DATE: 09-12-05 TECHNICIAN: A. Chairez Location of Sample Set Number I Location I Quantity Represented 1 Junction Box 8/8 Design Information Source of Concrete [ Mix Identification I Specified Strength p.s.i. LMC 1551 4000 Test Results Set Cylinder Age@ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 4067 09-19-05 7 82780 2930 4067 10-10-05 28 105410 3730 4067 10-10-05 28 107170 3790 3760 4067 11-07-05 56 116630 4130 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number 1 4067 5.0 4:15PM 94 90 4.0 3201031 Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Arthur Etherly, III Manager, CMT AE/Inc 2424STUTZ DR. · SUITE400 ,, DALLAS, TX75235 ,, TEL [214] 3505600 · F^X [2141350 0019