Hidden Valley-CS050428COPPELL
MEMORANDUM
TO:
FROM:
DATE:
REF:
Garreth Campbell, Engineering
Danny Hightower, Public Works
April 28, 2005
Hidden Valley Walkthru
2.
3.
4.
5.
6.
7.
8.
9.
10.
First valve needs pad
Mark MLV in blue on curb at first valve
Sewer main (east side) clean-out needs plug
Sewer lid (east side) needs to be painted red
Lower meter can to grade at 440
Old meters not to City specification (meter loop - new standard)
Replace meter can at 444
Clean sewer main holding in manhole
Missing City sewer clean-out on west side main
City sewer clean-out on 9 lots - repair bent-over pipe
Call 972-462-5150 to schedule Danny Hightower to check punch list after work completed.
GOPPEL/,
7955.200~
HP OfficeJet G Series G85xi
Personal Printer/Fax/Copier/Scanner
Fax-History Report for
Date Time T._vpe ~
Apr 28 8:33am Sent 7041
Duration ~ Result
0:24 1 OK
Result:
OK ~ black and white fax
Okay color - color fax
Apr 28 2005 8:34am