Loading...
Denton Tap 1A-LR051110ECS - Texas, LLP 4950 K¢llex Springs Road, Suit~ 480 Addison, TX 75001 (972) 392-3222 (FAX) 392~)102 CONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL TO: Little Diversified Arch. Consulting DATE: 11/10/?onq 5001 Spring Valley Road, Suite 282-W Providence Towers Dallas, TX 75244 PERMIT #: ATTN: Ms. Kathryn E. Rabuse JOB NO.: 004236A ~ LOCATION: f%~r~ 131 $. Denton Tapp Road, Coppell, TX  Dallas County County We are enclosing: X Attached X Materials Engineering Division Coricr~te Reports'. ~____ As Requested 5, 6 POSSIBLE LOW 28-DAY TEST RESULTS REPORTS 5, 6 CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. Ritchie City ofCoppell - Lee Stone City ofCoppell - Larry Davis C,j~ffruction Services Manager By: Daniel Franklin, P.E. President/Principal Engineer (FAX) 392-0102 Project: Wachovia - Coppell Location: 131 N. Denton Tapp Road, Coppell, TX Concrete Cylinders Strength Report Project: 4236-A Set Designation: A Cast Date: 11/02/2005 Design Strength: 5000 psi Report No.: 5 Owner: Wachovia Corporate Real Estate - Ken Arch.: Little Diversified Arch. Consultants - Philip Struc. Eng.: Client: Little Diversified Arch. Consultants - Gen. Contr.: Centex Construction Co. - Conc. Contr.: Placement Location: Slab-on-grade, sampled at 15'S/5'E of NW vault comer. Concrete Supplier: Southern Star Track No: 948 Ticket No: 943133 Mix Designation: 7522 Mix Strength: 5000 psi Batch Time: 09:05AM Added Water: 10 GMs. Time Added: 10:05A Unit Wt.: FIELD TEST DATA: Tested by:Louis J. DeRossi Time Sampled:l 0:10AM Slump:6.00 in. Temperature - Air: 62° F Concrete: 69° F Air Content:l.50 % (P) Sample Test Test Type Diameter Area Breaking Compr. Brk Break Review No Date Age Cure In. In? Load, lbs Str.,psi Typ by by 23753 I 1/09/2005 7 Lab 6.00 28.27 98528 3480 JBAI 23754 11/30/2005 28 Lab 6.00 28.27 23755 11/30/2005 28 Lab 6.00 28.27 23756 12/28/2005 56 Lab 6.00 28.27 I it. =u,~ ~.~,,= with ~ ASTM C172, except Ihat samplas rnay have bee~ lakefl from the beginning of tile load afi~ a minimum discflarge of appreximatsly o~e cubic yard. Cylinder ~ and laberatay cu~g iaw ASTM C31, compressive s~eng~ test and break ~/pe iaw ASTM C39, slump iaw Cl 43, air content law ASTM C173 00 or C231 (P), ternperalure law ASTM C1064, and unit weight iaw ASTM Cl 38. Cylinders are tasted using unbonded caps iaw ASTM C1231 or are capped using sulphur mortar law C617. Break Types are classif~ as: Type 1, 2, 3, 4, 5, or 6 iaw C39~4a FIELD CURING CONDITIONS: Curing Box Insulated Cooled Ice X No Curing Box Heated X Caps Other Remarks: Final Review By: I $SlBIE IHl128..BSY TEST BE$111,TS J'BA1 Print Date: 11/10/2005 (FAX) 392-0102 Project: Wachovia - Coppell Location: 131 N. Denton Tapp Road, Coppell, TX Concrete Cylinders Strength Report Project: 4236-A Set Designation: B Cast Date: 11/02/2005 Design Strength: 4000 psi Report No.: 6 Owner: Wachovia Corporate Real Estate - Ken Client: Little Diversified Arch. Consultants - Arch.: Little Diversified Arch. Consultants - Philip Gen. Contr.: Centex Construction Co. - Struc. Eng.: Cone. Contr.: Placement Location: Vault slab-on-grade, sampled at 40'E/5'S of NW corner of slab. Concrete Supplier: Southern Star Truck No: 8873 Ticket No: 943139 Mix Designation: 9349 Mix Strength: 4000 psi Batch Time: 09:30AM Added Water: 10 Gals. Time Added: 10:25A Unit Wt.: FIELD TEST DATA: Tested by:Louis J. DeRossi Time Sampled:10:30AM Slump:7.00 in. Temperature - Air: 65° F Concrete: 70° F Air Content:l.00 % (P) Sample Test Test cTuY~ Diameter Area Breaking Compr. Brk Break Review No Date Age In. In.2 Load, lbs Str.,psi Typ by by 23757 11/09/2005 7 Lab 6.00 28.27 79872 2820 JBAI 23758 11/30/2005 28 Lab 6.00 28.27 23759 11/30/2005 28 Lab 6.00 28.27 23760 12/28/2005 56 Lab 6.00 28.27 ~ampri~ pt that samples may have peas takas from the peginning of the Icad aft( · a minimum dischar approximatsly one cubic yard. Cylinda' mo{ding and lab~'at~y curing iaw ASTM C31, compressive sb'ength test and break {ype iaw ASTM C39, slump law 0143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit we~ht iaw ASTM C138. Cylinders are tested using unb~nped caps iaw ASTM C1231 or are capped using sulphur mortar iaw C617. Bre~ Types are classified as: Type 1, 2, 3, 4, 5, o~ 6 law C39-04a FIELD CURING CONDITIONS: Curing Box Insulated Cooled Ice X No Curing Box Heated X Caps Other Remarks: Final Review By: I'OI$1ILE Llii 2g-DRY'IT. ST BESILTS JBA 1 Print Date: 11 / 10/2005