Loading...
TR9701-CS 970617 (2)P~rlone Brinckerhoff CMAQ Program Office 1701 N. Market Street Suite 410 Dallas, TX 75202 214-747-6336 Fax:214-741-1937 June 17,1997 Mr. Mark Goode, P.E. Sverdrup Civil, Inc. 8150 N. Central Expy, Suite M-1150 Dallas, Texas 75206 Subject: Congestion Mitigation Air Quality Improvement Program Consolidated Design Review Comments Technical Memorandums Proposed Control Areas For The Northern & Southern Sections - Project 75 Dear Mr. Goode: The PM/E has received review comments from the affected governmental agencies for the Technical Memorandums Northern & Southern Sections - CMAQ Project 75. Attached are the consolidated review comments for your disposition. Please disposition these comments and return to the CMAQ Program office as soon as possible. After all comments are resolved and dispositioned, preparation of the final report should include the final dispositioned comments. If you have any questions, please contact me at 214-747-6336 ext. 26. Questions or further clarification of the review comments can be directed to Tony Tramel at ext. 28. Sincerely, Project Manager Attachment: Consolidated Review Comments (diskette) CC: ne, P.E., Dallas County Public Works Kathi Mullir 3f Irving Over · Centm'3~ ef Engineering Excellence D:~ROJEO'r~P14CORFf~P14-1ou'r~SVERDRUPM 997~002,DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/16/97 Sheet: 1 of: 8 Northern Section Proposed Control Area Reviewer: T Tramel I OrganizatiOn: Consolidated I Reviewer Telephone Number: 214-747-6336 ext. 28 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) 1. 35 Add discussion on the recommended coordinated intersection that are not interconnected or discussion on existing interconnection infrastructure. K Mu#ins/Irving #1 2. p3 Change street name of Cowboy to Wrangler Drive on map. A Patel/Coppell #1 3. p3 Show on the map the proposed signal locations. A Patel/Coppell #2 4. p4, sect. 2 Time-based coordination is the simplest method, however TxDOT is not connected @ LBJ/Belt Line. Coppell has time source hardware/software. Does Irving? A Pate// Coppell #3 5. p4, sect. 2 Eliminate the option of a force account agreement between the cities in the report. A Patel/Coppell #4 Action Codes Dispositioned By: A - Agree, Designer will comply Title: C - Disagree, Designer and Reviewer Resolution Required Date: D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~ROJ EC'IN~TSCH EM~7-3REV~°75~ EVI EW.DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/16/97 Sheet: 2 of: 8 Northern Section Proposed Control Area Reviewer: T Tramel I Organization: Consolidated I Reviewer Telephone Number: 214-747-6336 ext. 28 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) 6. p5, sect.--~-'-- How does the recommendation @ Belt Line/Denton Tapp w/Dallas display left turn heads affect E./W traffic @ this location? A Patel/Coppell #5 7. p6, sect1 Permission from TxDOT is necessary for the signal head and re-striping, & right turn overlap. A Patel/Coppell #6 8. Report Include graphics w/AM, PM, Noon Pk Hr turning movement counts. A Patel/Coppell #7 9. Report Include graphics w/each proposed hardware improvement recommendation A Patel/Cop, pell #8 10. p5, sect4 Include lane width recommendations for re- striping & graphic of new striping and signal improvement. Also mention the additional 5 section head required if new phasing is put Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E- Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~ROJEC'IN='07SCHElvN=7-3REV~7~REVIEW. DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM YEARS Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/16/97 Sheet: 3 of: 8 Northern Section Proposed Control Area Reviewer: T Tramel I Organization: Consolidated I Reviewer Telephone Number: 214-747-6336 ext. 28 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) in place for WB traffic. A Patel/Coppell #9 11. p5 Typo "suppresion" A Patel/Coppell #10 12. Report Identify the responsible agencies for the proposed improvements. A Patel/Coppell # 11 13. p6 What treatment is planned for 1-635, WB approach? Da/Co. #1 14. p6 Current and suggested phasing at 1-635, What is it? Dal Co. #2 15. Report Drawings and sketches would help a lot with the text. Dal Co. # 3 16. P4 Can't have a range of cycle lengths, be specific.. Dal Co. # 4 17. p4 Coordination between cities very week; beef up and be specific. Dal Co. #5 18. pl Does TxDOT operate 1-635; Why the north/south break point?, No mention made Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E- Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~PROJ ECT~°07SCHEIV~7-3R EV~P75~ EVI EW. DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/16/97 Sheet: 4 of: 8 Northern Section Proposed Control Area Reviewer: T Tramel I Organization: Consolidated I Reviewer Telephone Number: 214-747-6336 ext. 28 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) of existing City Limit or arrangements? Dal Co#6 19. all What about E/W coordination (off of Belt Line) Dal Co # 7 20. p5 Check/verify the number of vehicles making the SB left @ Denton Tapp/Bethel. Dal Co # 8 21. p4 Expand/explanation of selection of control areas by the use of collected data compiled into appropiate graphics, tables, charts. Need to include turning movement, signal phasing, and lane geometry graphic with report. PME #1 22. general Need to support conclusion and recommendations with supporting documentation. The memo represents is an excellent executive summary, but does not Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~ROJEC'r~::,07SCH EIVN='7-3REV~75'~clEVI EW. DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/16/97 Sheet: 5 of: 8 Northern Section Proposed Control Area Reviewer: T Tramel I Organization: Consolidated I Reviewer Telephone Number: 214-747-6336 ext. 28 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) Page/Section provide the technical detail necessary to stand on its own. Suggest use of technical Appendix, peak hour turning movement graphics, and lane geometry with phasing graphic representing existing conditions. Suggest modifying this graphic by noting changes on this second copy of phasing and lane assignments which are recommended. PME #2 23. general I would be interested in the travel time runs that identify the existing average running speeds and delays for each time period. This can best depicted on a speed profile graphic. PME # 3 24. pi,sect1, last revise to be specific rather than "most" and 2 sentences "two intersections", which two? reword and make it clear. PME#4 Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~DROJEC'i~P07SCHEM~7-3RE~7~EVI~. DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project 75 Submittal: Technical Memorandum Date: 6/17/97 Sheet: 6 of: 8 Southern Section Pro13osed Control Area Reviewer: T Tramel I Organization: PME Consolidated I Reviewer Telephone Number: 214-747-6336 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) All Drawings, sketches would help text. Dal Co #1 All See comments on Northern section Dal Co #2 All What about sub-systems to east and west of Belt Line? Need to identify/mention in text. Dal Co # 3 pl We mention count data and ped heads but were peds counted? Dal Co # 4 p4 What is a "natural cycle length"? No mention made about existing systems or cycle lengths, why not? Dal Co. # 5 p4 There is a need to provide coordination/communication south of Rock Island to assist in interjurisdictional coordination? Dal Co #6 135 Contact Grand Prairie to determine their Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~PROJEC~7SCHEIv~7-3REV~P75~EVIEW.DOC Project: CMAQ Project 75 Southern Section Reviewer: T Tramel Comment Drawing No./ No. Report Page/Section DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM I Submittal: Technical Memorandum I Date: 6/17/97 Proposed Control Area I Organization: PME Consolidated I Reviewer Telephone Number: Comment - (state fully action required, i.e., Response clarify, change, add, delete, etc.) ISheet: 7 214-747-6336 of: 8 Action general general existing cycle lengths south of Oakdale. there a need to consider "special event timing for Lone Star Park ? Dal Co #7 Is Need to support conclusion and recommendations with supporting documentation. The memo represents is an excellent executive summary, but does not provide the technical detail necessary to stand on its own. Suggest use of technical Appendix, peak hour turning movement graphics, and lane geometry with phasing graphic representing existing conditions. Suggest modifying this graphic by noting changes on this second copy of phasing and lane assignments which are recommended. PME #2 I would be interested in the travel time runs Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~ROJEC'r~07SCHEIVI~7-3REV~7~IEW, DOC DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project: CMAQ Project75 Submittal: Technical Memorandum Date: 6/17/97 Sheet: 8 of: 8 Southern Section Proposed Control Area Reviewer: T Tramel I Organization: PME Consolidated I Reviewer Telephone Number: 214-747-6336 Comment Drawing No. / Comment - (state fully action required, i.e., Response Action No. Report clarify, change, add, delete, etc.) that identify the existing average running speeds and delays for each time period. This can best depicted on a speed profile graphic. PME # 3 pi,sect1, last revise to be specific rather than "most" and 2 sentences "two intersections", which two? reword and make it clear. PME#4 p4 last section Suggest revising to identify signal timing conditions in Grand Prairie and assess the opportunity to provide additional inter- jurisdictional coordination with Grand Prairie. PME #5 Action Codes A - Agree, Designer will comply C - Disagree, Designer and Reviewer Resolution Required D - Delete, Reviewer Withdraws Comment E - Exception, Resolution Required N/A - Not Applicable Dispositioned By: Title: Date: Reviewer- Maintain a copy of your comments for future reference. Please enter Reviewer information at the top of the page. HAND WRITTEN COMMENTS ARE WELCOME. D:~°ROJECT~P07SCHEIVN:'7-3REV~75~EVIEW. DOC