Loading...
Ballet TX-CS051114COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works G-reg Jones, Chief Building Official Tim Oates, Interim FireChief Larry Davis, Construction Inspector~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 November 14, 2005 WALK-THRU for Ballet Academy A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for Wednesday, November 16, 2005 at 2:00 p.m. Please let me know ifI can be of further assistance. CC: Ken Head, Head Construction Tito, McFadden Fire Systems R-Con fax214-722-7635 fax214-349-7625 fax972-313-1372