Gibbs Station 2-CS 930723July 23, 1993
Mr. Bill Anderson
Dowde'y Anderson & Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 7~248
RE: Gibbs Station Phase H
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the development fee calculations for Gibbs Station Phase II.
Please provide a check made payable to the City of Coppell in the amount of $145,511.99 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee
assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this
project so the construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
CC'
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
July 23, 1~3
Gibbs Station Phase H
TOTAL
ASSESSMENT
Water Impact Fee $ 83,200.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 12,400.00
(100% due at Issuance of Building Permi0
Wastewater Impact Fee $ 27,675.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $ 12,300.00
(100% due at Issuance of Building Permi0
Utility F'mal lngl~tion Fee $ 6,150.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Lots) $ 2,736.75
(100% due at Issuance of Building Permi0
Water Meter Fee 0rrigation) $ 157. 00
(100% due at Issuance of Building Permit
Irrigation Meter Deposit $ 35.00
(100% due prior to issuance of Water Meters)
Water Meter Deposit $ 3,690.00
(100% due at Issuance of Building Permit)
Street Sign Fee $ 1,034.40
(100% due prior to Acceptance of Projec0
Street Light Fee $ *
(100 % due prior to Acceptance of Project)
Park Fee $ 43,050.00
(50% due prior to Council Approval)
(50% duc prior to Issuance of Building Permi0
Construction Inspection Fee
(2% of Project Cost due prior to
Preconstruction Meeting)
Total
$12,077.59
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
AMOUNT DUE
PRIOR TO COUNCIL
APPROVAL
$ 83,200.00
$ -0-
$ 27,675.00
$ -0-
$ -0-
$ -0-
$ -0-
$ -0-
$ -0-
$ 1,034.40
$ -0-
$ 21,525.00
$12,077.59
$145,511.99
$145,511.99
* See attached memo
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
The following
proj e ct:
July 22, 1993
Doug Stevens, Engineering Technician
Public Works Department
Development Fees for Gibbs Station Phase II
fees should be assessed on the above
referenced
Water Impact Fee:
123 - %" x ~"
1 - 1%"
Domestic Meter/s = 123 ESU's
Irrigation Meter/s = 5 ESU's
Total 128 ESU's @ $650.00 ea = ~
100% due Prior to Council approval of final plat.
Wastewater Impact
123 - %" x %" Residential meters = 123 ESU's
Total 123 ESU's @ $225.00 ea = $ 27,675.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
124 Connections @ $100.00 each = ~
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
123 Connections @ $100.00 each = ~
· 100% due prior to issuance of building permit.
DEVELOPMENT FEES
Page 2
UtilityFinal Inspection Fee
123 lots ~ S50.O0/lot = $6,150.00
100% due prior issuance of building permit.
Water Meter Fee (Lots)
123 - %" x ~" Residential Meters @ $22.25 ea
100% due prior to issuance cf building permit.
= $2,736.75
Water Meter Fee
1 - 1%"
(Irrigation)
Irrigation Meter @ S157.00 ea
Total
100% due prior to issuance of water meters.
= $157.00
= $157.00
Water Meter Deposit
Residential - 123 meters @ $30.00 ea = $3,690.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
1 - 1%" meters ~ $35.00 ea = $35.00
Total = $35.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots @ $150.00 ea = $
Units (Multi-family) @ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
123 Residential Lots @ $350.00 ea = S43o050.00
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
Development Fees
Page 4
for
STREET SIGN ASSESSMENT
Gibbs Station Phase II
The following assessment is being made in accordance with the city
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit 63.54 10 $635.40
Yield 58.56
Stop 65.12
Street Name 11.60
Stop & Street Combo 96.85 4 387.40
OTHER
No Outlet 11.60 1 11.60
TOTAL $1,034.40
Cost breakdowns may be obtained from Public Works by written
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.GIBBSII.HLP