Loading...
Gibbs Station 2-CS 930723July 23, 1993 Mr. Bill Anderson Dowde'y Anderson & Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 7~248 RE: Gibbs Station Phase H Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Gibbs Station Phase II. Please provide a check made payable to the City of Coppell in the amount of $145,511.99 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer CC' Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 23, 1~3 Gibbs Station Phase H TOTAL ASSESSMENT Water Impact Fee $ 83,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 12,400.00 (100% due at Issuance of Building Permi0 Wastewater Impact Fee $ 27,675.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 12,300.00 (100% due at Issuance of Building Permi0 Utility F'mal lngl~tion Fee $ 6,150.00 (100% due at Issuance of Building Permit) Water Meter Fee (Lots) $ 2,736.75 (100% due at Issuance of Building Permi0 Water Meter Fee 0rrigation) $ 157. 00 (100% due at Issuance of Building Permit Irrigation Meter Deposit $ 35.00 (100% due prior to issuance of Water Meters) Water Meter Deposit $ 3,690.00 (100% due at Issuance of Building Permit) Street Sign Fee $ 1,034.40 (100% due prior to Acceptance of Projec0 Street Light Fee $ * (100 % due prior to Acceptance of Project) Park Fee $ 43,050.00 (50% due prior to Council Approval) (50% duc prior to Issuance of Building Permi0 Construction Inspection Fee (2% of Project Cost due prior to Preconstruction Meeting) Total $12,077.59 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 83,200.00 $ -0- $ 27,675.00 $ -0- $ -0- $ -0- $ -0- $ -0- $ -0- $ 1,034.40 $ -0- $ 21,525.00 $12,077.59 $145,511.99 $145,511.99 * See attached memo COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following proj e ct: July 22, 1993 Doug Stevens, Engineering Technician Public Works Department Development Fees for Gibbs Station Phase II fees should be assessed on the above referenced Water Impact Fee: 123 - %" x ~" 1 - 1%" Domestic Meter/s = 123 ESU's Irrigation Meter/s = 5 ESU's Total 128 ESU's @ $650.00 ea = ~ 100% due Prior to Council approval of final plat. Wastewater Impact 123 - %" x %" Residential meters = 123 ESU's Total 123 ESU's @ $225.00 ea = $ 27,675.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 124 Connections @ $100.00 each = ~ 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 123 Connections @ $100.00 each = ~ · 100% due prior to issuance of building permit. DEVELOPMENT FEES Page 2 UtilityFinal Inspection Fee 123 lots ~ S50.O0/lot = $6,150.00 100% due prior issuance of building permit. Water Meter Fee (Lots) 123 - %" x ~" Residential Meters @ $22.25 ea 100% due prior to issuance cf building permit. = $2,736.75 Water Meter Fee 1 - 1%" (Irrigation) Irrigation Meter @ S157.00 ea Total 100% due prior to issuance of water meters. = $157.00 = $157.00 Water Meter Deposit Residential - 123 meters @ $30.00 ea = $3,690.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 1 - 1%" meters ~ $35.00 ea = $35.00 Total = $35.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots @ $150.00 ea = $ Units (Multi-family) @ $75.00 ea = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 123 Residential Lots @ $350.00 ea = S43o050.00 Units (Multi-family) at $350.00 ea = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Development Fees Page 4 for STREET SIGN ASSESSMENT Gibbs Station Phase II The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit 63.54 10 $635.40 Yield 58.56 Stop 65.12 Street Name 11.60 Stop & Street Combo 96.85 4 387.40 OTHER No Outlet 11.60 1 11.60 TOTAL $1,034.40 Cost breakdowns may be obtained from Public Works by written request. HLP/dm cc: Steven G. Goram Director of Public Works FEES.GIBBSII.HLP