Gibbs Station 2-CS 930722 (2)FRO~f :
COPP~r.r. PUBLIC WORKS
The following
proj eot:
July 22, 1993 ~
Doug.Stevens, Bnginee'~Technici~n
Public Works Departme~
Development Fees for GlDbs Station' Phase II
fees should be assessed on the above referenced
Water Impact Fee:
1 - 1~'°
Domestic Meter/s =123ESU's
Irrigation Meter/s = 5 ESU's
Total 128 ESU's ~ $650.00 ea = $83.200.00
100% due prior to Council approval of final plat.
Wastewater Impact
123 - ~" x ~" Residential meters = 123 ESU's
Total 123ESU's ~ $225.00 ea = S 27,675.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
124 Connections ~ $100.00 each = $ 12,400.00
100% due prior to issuance of building permit. (Or in
the irrigation meter-prior to issuance of meter).
the case of
Sewer Tap Inspection Fee
123 Connections ~ $100.00 each = ~
100% due prior to issuance of building permit.
DEFELOPHENTFEE$
Page 2
Utility Final Inspection Fee
123 lots ~ ~= $6.150.00
100% due prior issuance of building permit.
Water HeterFee (L~ts)
123 - ~" x ~" Residential Meters ~ $22.25 ea
100% due prior to issuance of building permit.
= $2.736.75
Water Meter Fee
1 - 1~"
(Irrigation)
Irrigation Meter @ S/57.00 ea
Total
100% due prior to issuance of water meters.
= $157.00
= $157.00
Water Meter Deposit
Residential - 123 meters ~ $30.00 ea = S3,690.00
100% due prior to issuance of building permit.
Irrigation HeterDeposit
1 - 1~" meters ~ S35.00 ea = $35.00
Total = $35.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Development Fees
Page $
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots ~ $150.00 ea = $
Units (Multi-family) ~ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
123 Residential Lots ~ $350.00 ea = $43.050.00
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
Development Fees
Page 4
for
STREET SIGN A~SESSMENT
Gibbs Station Phase II
The following assessment is being made in accordancewith the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN ~ OUANTI~ EXTENDED PRICE
No Parking $53.10
Speed Limit 63.54 10 $635.40
Yield 58.56
Stop 65.12
Street Name 11.60
Stop & Street Combo 96.85 4 387.40
OTHER
No Outlet 11.60 1 11.60
TOTAL $1,034.40
Cost breakdowns may be obtained from Public Works by written
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.GIBBSII.HLP