Loading...
Gateway BP (1.1)-CS 911211The City With A Beautiful Future December 11, 1991 P.O. Box 478 Coppell, Texas 75019 214-462-0022 PUBLIC WORKS ! Mr. Pat Acker Albert N. Halff Associates 8616 Northwest Plaza Dr. Dallas, TX 75225 / Re: Final Acceptance ~ %~ ~.~e~y BU~i~S~ P~k/Drop Structure Gra ~ar Mr. Acker: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. Structure completion has been verified and is in compliance with the City of Coppell'e standard requirements. Please follow the Erosion Control Ordinance, adopted by the City of Coppell, during the maintenance bond period. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (December 11, 1992). Construction Inspector CLD/bd cc: M. Shohre Daneshmand, Acting City Engineer Gary L. Sieb, Director of Planning and Community Services Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Ben dela Cruz, Engineer Technician Tony Johnston, Gibson & Associates GRAPEFIN