Gateway BP (1.1)-CS 911204COPPELL PUBLIC WORKS
DATE:
TO:
FROM:
RE:
December 4, 1991
Steven G. Goram, Director of Public Works
Rey Gonzales, Streets Superintenden~
Left Turn Lane from Freeport Parkway onto Gateway Blvd.
(Tickler 11/26/91)
Staff has met with the contractor on site and the contractor is in
the process of replacing the affected portion of the turn lane at
this time. This area should be poured back by 12/6/91 and open
seven days later. Next status 12/16/91.
RG/bc
LTLFREE.RG