Loading...
Gateway BP (1.1)-CS 911204COPPELL PUBLIC WORKS DATE: TO: FROM: RE: December 4, 1991 Steven G. Goram, Director of Public Works Rey Gonzales, Streets Superintenden~ Left Turn Lane from Freeport Parkway onto Gateway Blvd. (Tickler 11/26/91) Staff has met with the contractor on site and the contractor is in the process of replacing the affected portion of the turn lane at this time. This area should be poured back by 12/6/91 and open seven days later. Next status 12/16/91. RG/bc LTLFREE.RG