Jack In The Box-CS010212 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Garreth Campbell, Construction Inspector Engineering Danny Hightower, Utilities Division Public Works February 12, 2001 Follow-up Walk-thru Jack In the Box 1. All O.K. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 02,~12/01 16: 58 ID--CITY OF COPPELL DATE 02/12 S~R-TIME 00~21" DISTANT STATION ID MODE PAGES RESULT CITY OF COPPELL CALLING 01 OK 0000 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Garreth Campbell, Construction Inspector Engineering Danny Hightower, Utilities Division Public Works January 30, 2001 Walk-thru Jack In the Box 1. t'/Mark MLV in blue on curb - all. ~ 2. ~ Lock latch on vault. 3. t/Ball valves in vault need plug small and large. 4. ~/ Mark STB on pad in blue. 5. t~ Note: STB out under drive 5+67 on plans. 6. ~/Locate 1 valve S.E. of building. 7. c~"'Replace lid on water valve STB out S.W. of building. 8. ~ Mark aH F.H.V. in red on curb two F.H. 9. ~/F.H. on S.W. side of building turn to face south & remove plastic from bottom. 10. ~/Need 3' extension on F.H. valve N.W. of building. 11. "~eed 3' extension on STB to N.W. of building 1a valve past vault. 12. Paper work on DC in 2 vaults. 13. ~-/Paper work on DC in Irr. Box. 14. xfClean meter can inside below lower fittings. 15. ~ Cut down around vault N.W. of building for drainage. 16. ~/Raise manhole to ground high 1~ manhole south of building. 17. L/Mark in red on curb all manholes M.H. 18. '~/2"d manhole from building need to grout pipe inside. CITY OF COPPELL PUBLIC WORKS DEPARTMENT Phone ~n~e~: (~ WATER Employee: L~LrL~ ~ff[~ Grid m~p: (w~): Check for: Accuracy test:. Meter Leak: Initial meter relocation/m3~cfioas C~eck water press~re: Re-read 1. BaclcHow Ip~. 2. Re, ak 3. MaLntena~c~ 4. Other Back, ow [nsp. A. Mai~ L~e A. Pump A. Li~e Locate Bkflow Cern Date B. Valves B. Water Tower B. L~.e Locate Re-Cert. Date C. Service Li~e C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety $. Re,on for failure: A. Elecu'olysis B. New Co,~lraction C Poor Imtalhtion D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Ligh~ E. Other "l L,L~ r L . 7. ff Meter/Service Leak: Cl.~si~: - City: Customer A. Water Low (estimate): GPM __ B. Was Water Melted: Yes C. Was CustomerNot/fied: Verbally Fke plug flush/ag No Total Gallons Dootkn'ocker - 8. I£Meter L-"aa~ge O~t: Veh/clefEquipment Used Unit # M/les Firs Equipment A. Old Meter # Reading B. New Meter # Reading C. Old Meter Siz. x./Type: £. Type of work performed or f'mdiags: D New Meter Sizdrype 9. If malnllne or deep service repair, descn'be type of pipe or service tine and condition: ~) ~ /J,~t~, I/// /~/,~,.~ 10. Man-hours: Crew Members. 1 t. List Materials Used: 12. If you had aa accidenu-mcident while performing this request. Did you report it? Yes or no 13. Water Utilities meter in_s'pection: pass or fail 14. How many lxips to do ~ask? Signature Name: Phone Number: WATER Employee: ~ Ggd map: Check for: Accuracy test:. Meter Leak: Initial meter relocation inspections Check water pressure: Re-read 1. ~ 2. Reuair 3. Maintenance BacMlow Insp. A. Main Line A. Pump Bkilow Cert. Date B, Valves B, Water Tower Re-Cert. Date C. Service Line C, Samples D. Hydrants D. Equipment E. Safety 4. Other A. Line Locate B. Line Locate C. Tap D Excavation 5. Reasna for failure: A. Elecu'olysis B. New Construction C Poor Ins~!!!~ion D. O~er ~. List of safety e~uipment at site it' applicable: A. Barricades B. Cones C. Tape D. Lights E. Other 7. If Meter/Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM __ B. Was Water Metered: Yes C. Was Customer No~fied: Verbally. Fire plug flushing No Tmal Gallons Doorknocker - 8. If Meter Change Out: Vehicle/Equipment Used Uuit # Miles I-Irs Equipment A. Old Meter # Reading B. New Meter # Reading C. 0Id Meter Size/type: E. Type of work performed or findings: D New Meter Size~ype. 9. If mainline or deep service repair, descn'be ~ of pipe or service line and condition: t0. blan-hours: Crew Members. 11. List Materials Used: 12. If you had an acciden~Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or ['ail 14. How many l~ips to do task? Signature