Loading...
Gateway BP (1.1)-CS 910116 COMMISSION ROBERT H. OEOMAN, CHAIRMAN RAY STOKER, JR. WAYNEB. DUDDLESTEN STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION P.O. BOX 3067 DALLAS, TEXAS 75221-3067 ENGINEER-DIRECTOR ARNOLD W OLIVER, P.E. January 16, 1991 Control: Highway: County: 2374-7 IH 635 at Gateway Boulevard / Dallas Mr. Alan D. Ratliff City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 CONTACT: Attention: Mr. Larry Davis Dear Mr. Ratliff: We approved plans for rebuilding Gateway Boulevard/Cotton Street within the right of way of IH 635 with our letter of June 26, 1990, (copy attached). The State is satisfied with the work done on our right of way and offer no objections to releasing your contractor from further responsibility. Dis~,~e~ Traffic Operations Engineer LJW:pmh Attachment June 26~ 1990 Control: 2374-7 I.H. 635: At Gateway Boulevard Dallas County Mr. A].~n D. Ratliff City Manager C~ity of Col)pell P.O. Box 478 Coppell, Texas 75019 Dear Mr. Ratliff: We have examined the plans supplied with your letter dated June 20, 1990 and have no objections to the proposed recon- struction on our right of way. ~t.i~ our understanding that the Cit alntenance on all of ~a~ ....... z o[ ~oppeJ. l will assume ~wmy/uogton southeast from Station 10+71.02 including the portion shown on sheet P-4 where no work is beinF done. The State has no objection to elosinf Cotton Road at Freepcrt Parkway for this ~onstruction. Please notify Mr. Milton Gureeky at phone 436-1546 before starting work on highway right of way. _ LW:ja cc: Gurecky Blansett ---..~ F~le C-1 File C-5