Jack In The Box-CS00090111/01×00 10:34 CITY nF COPPELL ENGINEERING ~ CITY OF COPPELL N0~819 COPP- .i September 1, :2000 Terry Musselman Mayse & Associates, [nc. 14850 Quorum Drive, Suite 201 Dallas, TX 75240 RE: Jack In The Box Addition, Lot 1, Block 1 Fee Assessment Letter Dear Mr. Musselman: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $i 1,006,86 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A, Mar~in, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 214 304 55?0 CIT] - COPPELL ENGINEERING ~ CITY OF E °ELL DEVELOPMENT FEES JlENG[NEER: L[L.O RIGINAT~ON DATE: =SENT ASSES~:.'-::;*;T Park Fee .lack In The Box Addition (Lot 1, BIk I) Mayse & Associates, Inc. g/1/oo ASSE~E~ FEE AMOUNT PA~D DATE 9/1/00 Water Impact Fee 9/1100 Wast~water Impact Fee Street Sign $5,62S.00 $5,625.00 9/5/00 $2,250.00 $2,250.00 9/5/00 2%4% l/oo Street Ucjht Construction Inspection Roadway Impact-Zone Street Cut Permit notify street dept. $9,12S.02 $9,125.02 $3,131.86 $3,131.86 lO/23/oo 9/5/00 Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Heter (Domestic) Water Meter (Fire/Irrlg) Meter Deposit (Domestic) Meter Deposit (Flre/Irrig) Utility Final Inspection TOTAI.~ Notify utility dept. when meters, taps or deposits are paid Total Fees Fees Paid $20,131.88 $20,131.88 Amount Owed $o.oo Nu/b~ Prior To ConatructJon Erosion Control Approved E.P.A.-N.O.[. Recd. Const. Plan Approved Date Received Prior TO Final Acceptance AS Built Plan Recd. Paving 8ond Recd. Utilities Bond Recd. Erosion Control Maint. 11×01/00 10:34 CITY I]F COPI~ELL ENGINEERING ~ CITY OF COPPELL N0.819 DEVELOPMENT FEE TABLE ~03 Project: Jack In The Box Addition, Lot 1, Block 1 Date: 9/1/oo TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water i~pact Fee $5,625.130 $5,625.60 (100% due prior to Council Approval) Water Tap Inspection Fee '$200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $135.66 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,570.06 (1130 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Waatewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.06 (100% due at Issuance of Building Pe,rmit) P'~'k Fee $0.00 S0.00 (100% duc prior to Council Appr, oval) Roadway Impact Fee $3,131.86 $3,131.86 (100% duc prior to Council A, pproval) Street Light Fee ,Information not Available (1 O0 % due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee lhformation not Available rOTAn' '"' $18,137.58r' TOTAL ,~ffOUNT D,UE PRIOR TO COUNCIL APPROVAL $11,006.86 CITY OF COPPELL ENGINEERING a CITY OF' COPPELL DEVELOPMENT FEE WORKSHEET ~ROJECT: ./ack [n TAe Box Add_*_,,f.*_,,n, Lot 1, B/ack X DATE: PI]lO0 Writer Impact Fee: Domestic Meter(s): ~rrigation Meter(s): Fireline Meter(s): 1 - 1 1/2 inch = 5 ESU's 1 - 1 1/2 inch = 5 ESU's 0 = 0 ESU's 2-ainch = 2.5 ~ ESU's Total #: 12.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Wnter Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) · Hgation/Fireline Water Meter Fee: Total #: Total #: Total #; f 1 Irrigation Meter(s) ~ 0 Additional Irrigation Meter(s) @ $0.00 2 Fireline Meter(s) @ .~ (100% due prior to issuance of water meters)~[~_, ~ ~"~...~ Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. ~100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $450.0o ea. TWastewater Tap Inspection Fee: Total #: I .Connections @ $50.00 ca, (100% due prior to issuance of building permit) Utilit7 Final Inspection Fee (All developments): Total #: 1 Lots (~ S50.00 ea. (100% duo prior to ~ssuanoo of buJldln~l p~rmit) $5,625.00 $200.00 $35.00 $90.00 $2,250.00 $50.00 $50.00 Page t CITY ~F COPPELL ENGINEERING ~ CITY OF EOPPELL DEVELOPMENT FEE WORKSHEET PROJECT: Jack lnThe BoxA88~on,~otl, Block 1 DATE: 9/1/00 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - I 1/2 inch = 5 ESU's I - 1 1/2 inch = 5 ESU's 0 = 0 ESU's 2 ~8inch = 2.5 ~ ESU's Total#: 12.5 ESU's @ $450.00 ea, (100% due prior to Council approval of the final plat) $5,625.00 Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $200.00 Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $135,66 (Single family due prior to issuance ol building permit) (All other developments due prior to issuance of meter) $13566 lrrigation/Fireline Water Meter Fee: Total #: I Irrigation Meter(s) @ $135.66 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $3,217.20 (100% due prior to issuance of water meters) $135.66 $0.00 $6,434.40 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) $35.00 Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 es, (100% due prior to issuance of water meters) $90.00 Wastewater Impact Fee: Total Domestic Meters ESU's: @$450.00 ea, $2,250.00 Wastewater Tap Inspection Fee: Total #: I _ Connections @ $50.00 es, (100% due prior to issuance of building permit) $50,00 Utililty Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100¥~ due prior to ~ssuance ote bulldln9 permit) $50.00 Page I CITY Or- COPPELL ENGINEERING ~ CITY OF COP~-LL DEVELOPMENT FEE WORKSHEET N0.819 Q05 Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family ~ $0.00 per lot 0 Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-.of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. . Once the plans are submitted, $292.60 per light wilt be assessed. {I00% due prior to final acceptance of development) $0.00 -- $0.00 -- $3,131.86 ..Inf°rmation not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Con:struction Inspection Fees: A copy of the developmenl COntract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Deparlment. (2% of development cost required for private improvemenLs) (4% of development cost required for public improvements) _Information not Available Page 2 CITY OF COPPELL ENGINEERING ~ CITY OF COP~CLL RO.~DWA¥ Ill. ACT FEE CALCULATIONS PROJECT: DATE: Jack In The ~o~ Addition, Lot 1, Block l 9/1/00 ROADWAY UMPACT ,FF..E: Cat¢/,.oO, ** Cominco. iai -- ~a~d U~ ** ~t ~ Building ~a (s~ 2,868 Developm~t U~ ** 2.87 Ve~cl~ MiI~ ~r ~velopment U~t ** ff~ ~r Vehicl= MBe RoMway ~act F~ due ~ ~evelopment U~) n ~ehicl= M~ ~ ~vel~ U~t) x ~ ~r Ve~cle M~e) = $3,131.86 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2. Page 3 - Roadway Impact Fee Study) 11×01×00 214 304 35?0 C ! TY t' =OPPELL ENG ! NEER ! NG -~ C [ TY OF COl _L N0.819 DEVELOPMENT FEES SENT ASSESSMENT ASSESSED FEE AMOUNT PA.TD DATE Park ~ee 9/1/00 Water Impact Fee $5,G25.00 $5,625.00 9/5/00 9/1/00 Wastewater Impact Fee $2,250.00 $2,250.00 9/5/00 Street Sign Street IJght noUry street deoL 2%4% ConStruction Inspection $9,125.02 $9,125.02 10/23/00 9/1/00 Roadway [mpact-Zone $3,131.86 $3,131.86 9/5/00 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap InspectiOn Water Heter (Oomestic) Water Meter (Rre/[rrlg) Meter Deposit (DomesUc) Meter Deposit (Fire/]trig) Utility Final Znspectlon TOTALS Total Fees $20,131.88 Notify utility dept. when rnetem, taps or deposits are paid Fees Paid $20,131.88 Amount Owed $o.oo NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.L Reod. Const. Plan Approved Dat~ Received Prior TO Final Acceptance A~ Built Plan Recd. Paving 8Ond Recd. Utilities ~3nd Recd. Erosion Control Maint. !1×01×00 10:3~ CITY 0c COPPELL ENGINEERING ~ CITY OF COP~'":LL DEVELOPMENT FEE TABLE N0.819 Project: Jack In The Box Addition, Lot 1, Block l Date: 9/1/oo TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL . APPROVAL Water I~npact Fee $5,625.00 $5,625.{~0 (100% due prior to Council Approval) Water Tap inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $135.66 (I00 % due at Issuance of Water Meter) Water Meter Fee ('Irrigation/Fir~iine) $6,570.06 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit - $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 1 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Appr, oval) Roadway Impact Fee $3,131.86 $3,131.86 (100% due prior to Council Approval) Street Light Fee [nformation not Available (100 % due prior to Acceptance of Projec~ ][ Street Sign Fee [nformation not Available - , (100% due prior to Acceptance of Project ~ Construction Inspection Fee :Information not Available TOTAL $18,137.58 TOTAL AMOUNT DUE PRIOR 'To COUNCIL APPROVAL $11,006.86 11×01×00 10:54 CITY Or COPPELL ENGINEERING ~ CITY OF COP~-LL N0.819 Q02 September 1, 2000 Terry Musselman Mayse & Associates, Inc. 14850 Quorum Drive, Suite 201 Dallas, TX 75240 RE: Jack In The Box Addition, Lot 1, Block I Fee Assessment Letter Dea~ Mr. Musselman: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to thc City of Coppell in the amount of $i 1.006.86 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depar~nent will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: J'crmifer An'nstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director of Public Works Greg lones, Chief Building Official Gary Sims, Director of Leisure Services MESSAGE CONF I RMAT I ON 11/01/00 15:21 IDzCITY OF COPPELL DATE 11/01 S,R-TI~4E DISTANT STATION ID MODE PAGES 00~26'' CITY OF COPPELL CALLING RESULT OK 0000 ~----J/ ~ P.O. Box 478 ress ~ ~, ? I ME JR INSP. FEE INS~ tEE ~L IN ~. FEE ~,o~ 'S.WA~.$~:~ i, FEE ERVI E INSPECTION 'EVIC REGISTRATION EVIC TESTED REGISTRATI( ,' I"'/ ~ Received Service Address_ Date II UTILITY FINAL INSP. FEE SECURITY DEPOSITS-WATER ~f/2,/~ i ') ~- ,--,^, ,~ ~-~ 12_5 WATE~ / SEWE~ SERVICE SALES WATER METER SALES R~ENUE ~ ~'' ~ ~lq WATER TAP FEE SEWER TAP FEE CUSTOMER SERVICE INSPECTION BACKFLOW DEVICE REGISTRATION BACKFLOW DEVICE TESTED REGISTRATION METER TEST FEE 2075 ,, ,--j ,~ ~,~, MESSAGE CONF ! RMFtT 1' ON li/01/00 15:14 ID=CITY OF COPPELL DATE 11×01 S~R-TIME DISTANT STATION ID MODE PAGES RESULT CITY OF COPPELL CALLING 01 OK 0000