Loading...
Gateway BP (1.1)-CS 900906ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTON * CHICAGO · FORT WORTH 8616 NORTHWEST PLAZA DRIVE * DALLAS TEXAS 75225 214/7390094 September 6, 1990 AVO 10564 City of Coppell 255 Parkway Boulevard Coppell, TX 75019 Att: Mr. Steve Goram Director of Public Works Re: Gateway Business Park Coppell, Texas Water Line Refund Dear Steve: This letter is to request payment, from the City of Coppell, for the 16-inch water line to be constructed with the above referenced project. The 16-inch water line is being installed along Gateway Boulevard from Freeport Parkway west, a distance of 2,663 feet ending approximately 850 feet east of Royal Lane. This line is a part of the City of Coppell Capital Improvement Plan and is being installed at the request of the City. The request for payment of this line is in conformance with the City of Coppell Subdivision Ordinance, Capital Improvement Plan and Impact Fee Ordinance and State Bill 336 as passed. The cost to be refunded, based on bid unit prims, is $118,800.46. Please see the attached Bid Tabulation for this project (Exhibit A) and the Cost Calculation (Exhibit B). The construction of the 16-inch water line began on July 30, 1990. If you have any questions or require any further information please contact me. Thank you for your time and consideration in this matter. Very truly yours, Al .RERT H. HALFF ASSOCIATES, INC. Patrick b Acker, P.E. cc: Wayland Threadgill, Catellus Development Corp. TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT SURVEYING GLOBAL POSITIONING SYSTEM {G P S) LANDSCAPE ARCHITECTURE MUNICIPAL ENVIRONMENTAL REMOTE SENSING AND MAPPING PLANNING STRUCTURAL EXHIBIT B GATEWAY BUSINESS PARK - PHASE I SANTA FE PACIFIC REALTY CORPORATION AVO 10564 SEPTEMBER 6, 1990 (7) (1) (2) (3) (4) L.H. LACY L.H. LACY ITEM DESCRIPTION UNIT SECTION IV - WATER MAIN 1 2 3 4 5 6 7 16" DIA CL. 51 D.I. PIPE 16" DIA BY OTHER THAN OPEN CUT CAST IRON FITTINGS 16" BUTTERFLY VALVE 16"x12" CROSS TEST AND STERILIZATION TRENCH EXCAVATION PROTECTION 16" WATER TOTAL LF LF TON EA EA LS LF QUANTITY 2680 65 6.6 5 1 0.50 2680 UNIT TOTAL PRICE COST $26.00 $135.00 $2,163.00 $4,580.00 $1,854.00 $1,030.00 $0.30 $69,680.00 $8,775.00 $14,275.80 $22,900.00 $1,854.00 $511.66 $804.00 $118,800.46 PRICE COST PRICE COST PRICE SY 17106 $16.82 EY 17106 $15.38 SY 17869 $1.14 TN 312.7 $74.00 LF 7385 $1.00 CY 9212 $1.40 LF 267 $4.00 LF 959 $5.00 LF 87 $7.00 LF 700 $6.00 SY 1936 $1.70 BY 1467 $1.70 LB 1 $4,000.00 L6 i $3,000.00 $287,722.92 $263,090.28 $20,370.66 $23,139.80 $7,385.00 $12,596.80 $1,068.00 S4,795.00 $609.00 $4,200.00 $3,291.20 $2,493.90 $4,000.00 S3,000.00 $15.62 $17.77 $1.30 $78.00 $1.26 $6.70 $7.90 $9.60 $4.80 $5.00 $5.00 $4,410.00 $5,000.00 $303,973.62 $23,229.70 $24,390.60 $7,385.00 $11,607.12 $1,788.90 $7,576.10 $835.20 $3,360.00 $9,680.00 $7,335.00 $4,610.00 $5,000.00 $16.17 $16.50 $1.79 $75.00 $0.56 $1.80 $3.82 $5.13 $7.14 $6.00 $5.60 $5.32 $4,600.00 $3,900.00 $372,478.38 $417,776.34 $276,604.02 $282,249.00 $31,985.51 $23,452.50 $4,135.60 $16,581.60 $1,019.94 $4,919.67 $621.18 $4,200.00 $10,648.00 $7,804.44 $4,600.00 $3,900.00 $16.40 $15.62 $1.00 $80.00 $1.20 $1.77 $3.75 $5.03 $7.01 $5.89 $5.35 S5.35 $4,494.00 $4,815.00 $280,538.40 $267,195.72 $17,869.00 $25,016.00 $8,862.00 $16,305.24 $4,823.77 $609.87 $4,123.00 $10,357.60 $7,848.45 $4,815.00 $16.50 $15.80 $1.30 $83.00 $1.1o $1.80 $3.80 $5,00 $7.10 $6.00 $5.40 $5.40 $4,500.00 $5,800.00 $282,249.00 $270,274.80 $23,229.70 $25,954.10 $8,123.50 $16,581.60 $1,014.60 $4,795.00 $617.70 $4,200.00 $10,454.40 $7,921.80 $4,500.00 $5,800.00 $382,668.02 $378,815.13 $387,519.60 $350,339.64 $410,571.24 $396,I17.44 $373,320.90 $383,467.20 PA~E 4 (1) (2) (3) (4) (7) (6) (8) (10) (11) (12) I (13) (14) (15) (16) i~A* 15' DIA RCC~ WATER PIPE LF 2663 2663 90 90 2715 2715 190 190 190 10.3 4 32 5378 $26.00 $29.00 $135.00 $42.00 $18.20 $0.00 $98.00 $47.00 $21.00 $2,163.00 $4,580.00 $706.00 $304*00 $1,025.00 $1,674.00 $1,854.00 $1,029.00 $1,030.00 $36.00 $0.30 $773.00 $69,238.00 $77,227.00 $12,150.00 $3,780.00 $69,413.00 $0.00 $18,620.00 $8,930.00 $3,990.00 $22,278.90 $10,320.00 $10,590.00 $4,560.00 $2,050.00 $1,676.00 $1,654.00 $15,425.00 $1,030.00 $1,152.00 $1,613.40 $773.00 $30.51 $35.41 $110.00 $95.00 $17.62 $20.00 $70.00 $70.00 $20.00 $2,500.00 $5,000.00 $900.00 $400.00 $1,500.00 $3,000.00 $3,000.00 $900.00 $1,000.00 $50.00 $o.5o $500.00 $81,248.13 $96,296.83 $9,900.00 $8,550.00 $48,381.30 $54,300.00 $13,300.00 $13,300.00 $3,800.00 $25,750.00 $20,000.00 $15,500.00 $6,000.00 $3,000.00 $3,000.00 $3,000.00 $13,500.00 $1,000.00 $1,600.00 $2,689.00 $500.00 $31.80 $34.00 $127.00 $121.00 $20.00 $21.50 $96.00 $75.50 $30.00 $2,600.00 $3,800.00 $850.00 $360.00 $1,200.00 $2,600.00 $2,700.00 $1,250.00 $670.00 $81.00 $0.11 $1,100.00 $84,683.40 $90,542.00 $11,430.00 $10,890.00 $54,300.00 $58,372.50 $18,260.00 $14,345.00 S5,700.00 $26,780.00 $15,200.00 $12,750.00 $5,400.00 $2,400.00 $2,600.00 $2,700.00 $18,750.00 $670.00 $2,592.00 $591.58 $1,100.00 WATER SUBTOT.~ $234,741.30 $250,168.43 $265,886.98 *WATER EUB'ZOTAL (ALTE~TE) $224,670.30 $267,785.83 $271,383.08 $30.50 $34.24 $121.98 $121.98 $19.47 $92.02 $75.97 $28.89 $2,514.50 $3,638.00 $823.90 $347.75 $1,177.00 $2,498.48 $2,621.50 $1,196.40 $662.00 $78.11 $428.00 $81,221.50 $91,181.12 $10,978.20 $10,978.20 $52,861.05 $58,671.15 $17,483.50 $662.00 $31.50 $32.50 $168.00 $73.00 $22.00 $22.00 $63.00 $73.00 $22.00 $2,300.00 $7,400.00 $1,000.00 $525.00 $2,000.00 $4,300.00 $4,000.00 $1,700.00 $2,600.00 $78.00 $0.50 $1,900.00 $83,884.50 $86,547.50 $6,570.00 $59,730.00 $59,730.00 $13,870.00 $4,180.00 $23,690.00 $29,600.00 $15,000.00 $7,875.00 $4,000.00 $4,300.00 $4,000.00 $25,500.00 $2,600.00 $2,496.00 $2,669.00 $1,900.00 $255,670.80 I $298,534.50 $268,391.02 I $294,547.50 PAG~ 5 (1) (2) ' (3) ' (4) ' (7) ' (9) (9) (10) ] (1. i .2) i (13) .4> (18) (16) LF 2080 LF 1612 LF 50 LF 50 EA 12 LS 1 LF 3742 L8 i $13.60 $81.00 $53.00 $6,077.00 $0.50 $1,030.00 $16.79 $14.28 $90.00 $120.00 $1,300.00 $1,000.00 $1.00 $800.00 $34,923.20 $23,019.36 $4,500.00 $6,000.00 $15,600.00 $1,000.00 $3,742.00 $500.00 $18.55 $18.30 $109.00 $115.00 $1,850.00 $2,850.00 $38,584.00 $29,499.60 $5,450.00 $5,750.00 $22,200.00 $2,850.00 $374.20 $28,288.00 $17,893.20 $4,050.00 $2,650.00 $15,756.00 $6,077.00 $1,871.00 $1,030.00 $74,965.20 $83,284.56 $100,057.80 $73,565.20 $84,784.56 $100,357.80 $97,479.54 $111,565.00 BABE BID SL~F~y