Loading...
Gateway BP (1.1)-CS 900212 (2)DONALD E. DAVIS CONSULTING ENGINEERS 5506 COCKRELL HILL ROAD DALLAS, TEXAS 7523~ (214) 337-2332 FEB. 12, 1990 CO190022.AHP DESI~ DATA THE FACTORS USED IN DESIGN METHOD 1 ARE: RESIDENTIAL USES: S UNITS PER ACRE 3.5 PERSONS PER UNIT 100 GALLONS PER DAY PER PERSON COMMERCIAL USES: 25% BUILDING TO LAND RATIO I PERSON PER 100 SQ. FEET 100 GALLONS PER DAY PER PERSON INDUSTRIAL AND OFFICE USES: 33% BUILDING TO LAND RATIO 1 PERSON PER 330 SQ. FEET 100 GALLONS PER DAY PER PERSON A THIRD METHOD BASED ON FIXTURE UNITS WAS INVESTIGATED. INDICATION OF THE RESULTS WERE VERY CLOSE TO METHOD NUMBER METHOD WAS THEREFORE CONSIDERED TO BE UNNECESSARY. THE PRELIMINARY ONE. THIS THIRD THERE ARE 3 PUMPS AT THE OUTFALL OF THIS SANITARY SEWER WITH A CAPACITY OF 15 M.G.D.. A STUDY SHOULD BE MADE TO DETERMINE IF OTHER AREAS ARE TO BE PUMPED THROUGH THIS STATION AND IF THE PUMPS AND OTHER FACILITIES ARE ADEQUATE FOR THE FUTURE DEVELOPMENT. GATEWAY BUSINESS PARK WATER AND WASTEWATER DEMAND ANALYSIS II. POPULATION FORECAST FOR LIGHT INDUSTRIAL LAND USE A. Assumptions 2. 3. 4. 85% of gross land area is developable land. 50% of developable land is gross floor space. 50% of gross floor space is office area. One person per 150 square feet of office area. Calculations 1. For one acre of land zoned light industrial: 43,560 S.F. (0.85) (0.50) (0.50) 1/150 = 61.71 people / AC ~ 62 P/AC. 2. Tributary area population: 103 Ac Onsite 30 Ac Offsite 133 Ac Total (62 P/AC) = 8246 People WASTEWATER DEMAND FORECAST A. Assumptions (Source: Texas Department of Health and Texas Department of Water Resources) Daily Demand = 20 Gallons per day per person Peaking Factor -- 4 Infiltration = 150 Gallons per day per acre Calculation of peak flow plus infiltration QT 8246 P (20 gpd/c) (4) + 133 AC (150) 659,680 + 19,950 679,630 gpd 0.68 MGD me WATER DEMAND FORECAST - (Onsite area only) A. Assump!ions 1. Daily Demand = 24 Gallons per day per person (Source: Texas Department of Health). Peaking factor for conversion of average day to maximum day = 2. Peaking factor for conversion of maximum day to maximum hour -- Calculation of maximum hour demand: QMH = 103 AC (62 P/AC) 24 gpa/c) (2) (2) = 613,056 gpd = 0.61 MGD ~ --2_l-qo