Loading...
Gateway BP (1.1)-CS 900131ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTON · CHICAGO · FORT WORTH 8616 NORTHWEST PLAZA DRIVE · DALLAS, TEXAS 75225 2141739 0094 January 31, 1990 AVO 10564 City of Coppell 255 Parkway Coppell, Texas 75019 Attention: Mr. Ru~ell~O~o~le, P.E. City/~tgineer Re: Storm Drainage Criteria for Gateway Business Park. Dear M~. Doyle: This letter is in response to my recent conversation with Ms. Shohre Daneshmand of your office. The City of Coppell Storm Drainage Criteria currently states that the criteria will generally conform to the "Storm Drainage Design Manual" Published by the City of Dallas and that the computed rainfall intensities should be based on Technical Paper 40. The City of Dallas design criteria utilizes Hydro-35 for durations of 0 to 60 minutes and TP-25 for durations greater than 60 minutes as shown on the attached Rainfall Intensity Curve Page 2, Section IV Appendix, City of Dallas Public Works Department Storm Drainage Design Manual Rev. Spring 1988. Also please find enclosed a comparison of the Rainfall Intensities for Hydro 35, TP-25 and TP-40 (compared in cumulative inches). We are requesting that the Hydro 35 criteria be utilized for durations of 0 to 60 minutes. We are not requesting the use of TP-25 for durations greater than 1 hour and would prefer the use of TP-40 for durations greater than 1 hour. I am enclosing a copy of the Hydro 35 study and as you will see this study was performed to supplement the TP-40 study for durations of less than 1 hour. TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL STRUCTURAL SURVEYING GLOBAL POSITIONING SYSTEM (G PS) REMOTE SENSING AND MAPPING LANDSCAPE ARCHITECTURE PLANNING ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS This request was approved in theory for this project. The previous construction plans for Gateway Business Park, Phase I approved May 5, 1988, reflect the modification to the City criteria that was approved in the fall of 1987 for this development. At that time city staff approved the use of a 0.7 runoff coefficient rather than the use of Hydro 35 intensities. The reason was that for times of concentrations between 0 and 30 minutes the 0.7 times TP-40 intensities approximated 0.9 times Hydro 35 intensities. As we discussed today by phone, we are proceeding with the storm sewer design based on a runoff coefficient of 0.9 and utilizing Hydro 35 Rainfall Intensities for duration of less than 1 hour per the City of Dallas Storm Drainage Design Manual. Thank your for your time and consideration in this matter. I will be contacting Ms. Daneshmand this week to set up a meeting on this project for early next week. Very truly yours, A! ~gERT H. HALFF ASSOCIATES, INC. Patrick L. Acker, P.E. CC-' Mr. Wayland Threadgill Santa Fe Pacific Realty Corporation Ms. Shohre Daneshmand City of Coppell SHORT DURATION ($ TO 60 MINUTES) PRECIPITATION DATA (INCFP~S) FROM U.S. WEATHER BUREAU PUBLICATIONS TP-25, TP-40, HYDRO-35 DALLAS AREA STORM RETURN T.P.-25 T.P.-40 HYDRO-35 DURATION PERIOD (1955)** (1961) (1977) (MINUTES) (YEARS) 5 10 15 3O 60 2 .49 .57 .49 5 .56 .74 .58 10 .63 .85 .64 25 .69 1.00 .74 50 .76 1.06 .81 100 .83 1.23 .89 2 .77 .87 .82 5 .88 1.14 .96 10 .96 1.32 1.07 25 1.08 1.54 1.23 50 1.22 1.64 1.35 100 1.32 1.89 1.48 2 .99 1.10 1.05 5 1.18 1.44 1.23 10 1.26 1.66 1.37 25 1.40 1.94 1.57 50 1.58 2.07 1.73 100 1.75 2.39 1.88 2 1.47 1.53 1.47 5 1.77 2.00 1.80 10 1.82 2.31 2.04 25 2.20 2.70 2.38 50 2.40 2.87 2.65 100 2.60 3.32 2.91 2 1.92 1.89 1.90 5 2.39 2.52 2.39 10 2.73 2.89 2.73 25 3.20 3.40 3.21 50 3.40 3.84 3.59 100 3.80 4.25 3.97 TP-25 NUMBERS REFI.~.CT NATIONAL AVERAGE ADJUSTMENT FACTORS IN ORDER TO COMPARE THE ANNUAL SERIES DATA (TP-25) WITH THE PARTIAL DURATION SERIES DATA (TP-40 AND HYDRO-35)