Gateway BP (1.1)-CS 900119ALBERT H. HALFF ASSOCIATES, INC.
ENGINEERS · SCIENTISTS · SURVEYORS
DALLAS · ARLINGTON · CHICAGO · FORT WORTH
8616 NORTHWEST PLAZA DRIVE · DALLAS TEXAS 75225
214/739-0094
January 19, 1990
AVO 10564SS / PP01
City of Coppell
255 Parkway
Coppell, Texas 75019
Attention:
Re:
Ms. Taryon Bowman
Gateway Business Park - Preliminary Plat
Dear Ms. Bowman:
Please find attached the above referenced preliminary plat and support data. We
are requesting that this plat be scheduled for the March 15, 1990 Planning Commission~
Meeting. We are submitting at this early date in order that we might start working with
the City Staff on the various aspects of the project and get a schedule of the fees that will
become due throughout the project.
Please note that a revision to the master thoroughfare plan has already been
requested thru this project. In addition we are requesting the following:
Overhead power to be allowed along the back and side properly lines of the
project with the understanding that no overhead power will be constructed
across or within street right-of-ways within this project.
The landscaping of Parkways shall be completed as the individual lots are
developed.
All applicable fees, shall be paid by lot owners as the individual lots are
developed and replatted.
That open channel drainage will not be allowed without a concrete pilot
channel.
TRANSPORTATION WATER RESOURCES LAND DEVELOPMENT
SURVEYING GLOBAL POSITIONING SYSTEM (G PS )
X~: ~O$/ ~YLE, ~,l't'¥ F.,'~I;~g-ER LANDSCAPE ARCHITECTURE
Yours very truly,
Al.BERT H. HALFF ASSOCIATES, INC.
Patrick Lee Acker, P.E.
MUNICIPAL ENVIRONMENTAL STRUCTURAL
REMOTE SENSING AND MAPPING
PLANNING