Loading...
Freeport NIP(7.5)-CS010917gGNT B~: CZTY OF COPPELL; TO: SERVICE CENTER 304 70at; G?2,304.,35a7 ~EP-t8-0t 2:22PM; PAGE t/t I~I~.MORANDUlVl FROM THE DEPAR~NT OF ENGINEERING To: D~te: RF4 Ken Griffin, Director of EngheeF Glenn HolJowell, Afst. Director of Public Works Gr~ Jones, Chief BulldiBg Of~bd Trnvis Crump~ Fire Mmhal Larry D~ Conmcflou ImlH~tor September 17, 2001 WALK-THRU for Freepofl A final walk-thru for street, utilities and drsinsge ou *be referenced project hss been scheduled for Thursday, September 27, 2001 at 8: 30 Ill ~an be of ruFther assistance please let me know. Lee S~n~ Commerehl Inspector Robnd AJ~bed~ AJs~ Fh'e Mnrshd Buffer Conshlcflou, Gar~ Green Po~.er Concre~ Tr~Dah Lt~ I 817-267-1902 214~8~1066 817~81~19S