Grand Cove-CS 940419COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
April 19, 1994
Engineering Department
Public Works Staff
Development Fees for Grand Cove Estates
The following fees
referenced project.
Water Impact Fee:
22 - 5/8" x 3/4"
Total
should
be assessed and collected on
Domestic Meter/s = 22 ESU's
Irrigation Meter/s = __ ESU's
Fireline Meter/s = __ ESU's
22
100% due prior to Council approval
ESU's @ $650.00 ea = $14,300.00
of the final plat.
Wastewater Impact (City)
22 - 5/8" x 3/4" Domestic Meter/s =
Total 22 ESU's @ $450.00 ea =
100% due prior to Council approval
22 ESU's
$ 9, oo.oo
of final plat.
the above
Water Tap Inspection Fee
22 Connections @ $100.00 each = $ 2,200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
22 Connections @ $100.00 each = $2,200.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
22 lots @ $50.00/lot = SI.lO0.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
22 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 489.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Deposit (Residential)
22 Meters @ $30.00 ea = $ 660.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such
permit is issued.
by the Developer;
time as a building
Development Fees
Page 3
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
22 Residential Lots at $1,285.00 each = $28.270.00
Units (Multi-Family) at $1,285.00 each = $
be paid by the Developer
100% of the amount specified above shall
prior to Council approval of final plat.
Please advise the Developer of these fees
and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, chief Building Official
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Grand Cove Estates
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 3 $190.62
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 1 96.85
OTHER
No Outlet $11.60 1 11.60
* Cost breakdowns may be
request.
TOTAL $299.07
obtained from Public Works by written
DEVFEES.HLP Revised 1/14/94