Hollows-CS 990714COPPELLUTILITIES DIVISION
DATE:
TIME:
TO:
FROM:
RE:
July 14, 1999
Garreth Campbell, Construction Inspector
Danny Hightower, Utilities Division
Followup Walk-thru Hollows at Northlake Woodlands
Listed below are Utility Division comments relative to walk thru.
1. Lot 35A manhole needs to be raised to ground level.
MESSAGE
CONF I RMAT I ON
07/15/99 0?: 17
IDzCITY OF COPPELL
[:,ATE
S,R-T[ME
DISTANT STATION ID MODE PAGES RESULT
CITY OF COPPELL CALLING 01 OK 0000
CITY OF COPPELL a CITY DF COPPELL N0.016 Q01
DATE: 7/7/00
TO:
Garreth Cankobell, Construction Inspector
utilities Division
Walk-thru Mollows at Northlake Woodlands
Listed below are Utility Division co~ents relative to walk thru.
Missing blowoff valve (Hollow Circle); Z~l irrig=ion Oox n~edS
to be dry;,~~ gui de sac no biowof£.
2. Lot 2~A sweep t in backwards.
3. Lot 34A crushed sewer cleano~t.
4. Lot 35A relgca%!.Dg m~nhg.l;-~einsDect on final.
5. Chimne~ seal manhole-reset.
6. Paint 1'~. manhole ext. white (existin~ maQ,hole).
Manhole needs center chimney ring. __
~xisting manhole with new pipe, needs regroutin~.~__~:'~und, pipe.
Feed to subdivision needs to be marked, also need concrete
pad - Mallard Dr.
I0d L60 '0N ,; [ 66~ £ [