Loading...
Hollows-CS 990714COPPELLUTILITIES DIVISION DATE: TIME: TO: FROM: RE: July 14, 1999 Garreth Campbell, Construction Inspector Danny Hightower, Utilities Division Followup Walk-thru Hollows at Northlake Woodlands Listed below are Utility Division comments relative to walk thru. 1. Lot 35A manhole needs to be raised to ground level. MESSAGE CONF I RMAT I ON 07/15/99 0?: 17 IDzCITY OF COPPELL [:,ATE S,R-T[ME DISTANT STATION ID MODE PAGES RESULT CITY OF COPPELL CALLING 01 OK 0000 CITY OF COPPELL a CITY DF COPPELL N0.016 Q01 DATE: 7/7/00 TO: Garreth Cankobell, Construction Inspector utilities Division Walk-thru Mollows at Northlake Woodlands Listed below are Utility Division co~ents relative to walk thru. Missing blowoff valve (Hollow Circle); Z~l irrig=ion Oox n~edS to be dry;,~~ gui de sac no biowof£. 2. Lot 2~A sweep t in backwards. 3. Lot 34A crushed sewer cleano~t. 4. Lot 35A relgca%!.Dg m~nhg.l;-~einsDect on final. 5. Chimne~ seal manhole-reset. 6. Paint 1'~. manhole ext. white (existin~ maQ,hole). Manhole needs center chimney ring. __ ~xisting manhole with new pipe, needs regroutin~.~__~:'~und, pipe. Feed to subdivision needs to be marked, also need concrete pad - Mallard Dr. I0d L60 '0N ,; [ 66~ £ [