Hollows-CS 990707COPPELL UTILITIES DIVISION
DATE:
TIME:
TO:
FROM:
RE:
Garreth Campbell, Construction Inspector
Utilities Division
Walk-thru Hollows at Northlake Woodlands
Listed below are Utility Division comments relative to walk thru.
1· Missing blowoff valve (Hollow Circle); 2" irrigtion box needs
to be dry; 2nd cul de sac no blowoff.
2. Lot 26A sweep t in backwards.
3. Lot 34A crushed sewer cleanout.
Lot 35A relocating manhole-reinspect on final.
Chirmney seal manhole-reset.
7.
8.
9.
Paint 1~t manhole ext. white (existing manhole)·
Manhole needs center chimney ring.
Existing manhole with new pipe, needs regrouting around pipe.
Feed to subdivision needs to be marked, also need concrete
pad - Mallard Dr.
MESSAGE
CONF I RMAT I ON
0?/08/99 1:]: 14
ID--CITY OF COPPELL
DATE
A? -OF:
S,R-TIME
01' £~2"
DISTANT STATION ID MODE PAGES RESULT
CITY OF COPPELL CALLING 04 OK 0000