Gulf Bearing-CS 951103DATE: TO: FROM: RE: COPPELL UTILITIEB / Nove~tber ~, 199S Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent~ Walk Thru for Gulf Bearing A walk thru was conducted on November 2, 1995 on the above referenced project. The following items were found to be deficient. Fire vault needs to be inspected after the water is turned Main line water valve is missing near manhole construction. Check southwest hydrant after pour. Flush manhole on property is standing %" in water invert. HLP/dg