Loading...
Gulf Bearing-CS 950203COPPELL ENGINEERING ~EMORANDUM DATE TO: FROM: RE: February 3, 1995 ~1 Mike Martin, Grad. Engineer Howard Pafford, Utilities Superintendent Development Fees for Gulf Bearing The following fees should be assessed and collected on referenced project. Water Impact Fee: Domestic Meter/s = 16 ESU's 1 2" 1 6" Irrigation Meter/s = 8 ESU's Fireline Meter/s = 2.5 ESU's Total 26.5 ESU's ~ $650.00 ea = $ 17.225.00 100% due prior to Council approval of the final plat. the above Wastewater Impact 2 - 2" Domestic Meter/s = 16 ESU's Total 16 ESU's ~ $450.00 ea = $ 7,200.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections ~ $100.00 each = $400,00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots ~ $50.00/lot = S50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water WeterFee (Domestic) 2 - 2" Domestic Meters @ 173.65 ea = $347.43 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - ~" 1 - 8" 100% (Irrigation/Fireline) Irrigation Meter/s @ S173.65 ea = Fireline Meter/s ~ $ 2.378.00 ea = TOTAL due prior to issuance of water meter/s. Sl 73.65 S2.378 .oo S 2. 551.65 Water NeterDeposit (Multi-Family or Non-Residential) 3 Meters @ S35.00 ea = S105.00 100% due prior to issuance of water meters. Irrigation NeterDeposit 1 Meters @ S35.00 ea = S35.00 100% due prior to issuance of water meters.