Gulf Bearing-CS 950203COPPELL ENGINEERING
~EMORANDUM
DATE
TO:
FROM:
RE:
February 3, 1995 ~1
Mike Martin, Grad. Engineer
Howard Pafford, Utilities Superintendent
Development Fees for Gulf Bearing
The following fees should be assessed and collected on
referenced project.
Water Impact Fee:
Domestic Meter/s = 16 ESU's
1 2"
1 6"
Irrigation Meter/s = 8 ESU's
Fireline Meter/s = 2.5 ESU's
Total 26.5 ESU's ~ $650.00 ea = $ 17.225.00
100% due prior to Council approval of the final plat.
the
above
Wastewater Impact
2 - 2" Domestic Meter/s = 16 ESU's
Total 16 ESU's ~ $450.00 ea = $ 7,200.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections ~ $100.00 each = $400,00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Utility Final Inspection Fee (Ail Development)
1 lots ~ $50.00/lot = S50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water WeterFee (Domestic)
2 - 2" Domestic Meters @ 173.65 ea = $347.43
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
1 - ~"
1 - 8"
100%
(Irrigation/Fireline)
Irrigation Meter/s @ S173.65 ea =
Fireline Meter/s ~ $ 2.378.00 ea =
TOTAL
due prior to issuance of water meter/s.
Sl 73.65
S2.378 .oo
S 2. 551.65
Water NeterDeposit (Multi-Family or Non-Residential)
3 Meters @ S35.00 ea = S105.00
100% due prior to issuance of water meters.
Irrigation NeterDeposit
1 Meters @ S35.00 ea = S35.00
100% due prior to issuance of water meters.