Loading...
Gulf Bearing-CS 950707DEVELOPMENT FEES PROJECT NAME: Gulf United Industries Addition ENGINEER: Ross Ramsey F~EVISION DATE: 7/7/95 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID Park Fee 2/8/95 Water Impact Fee $17,225.00 $17,225.00 2/8/95 Wastewater Impact Fee $7,200.00 $7,200.00 Street Sign Street Light Construction Inspection $1,401.78 $1,401.78 Irrigation 2/8/95 Street Escrow/Impact $54,568.00 $54,568.00 5/22/95 Overtime Inspection (5/20) $116.00 $116.00 2/8/95 Water Tap inspection $400.00 $400.00 2/8/95 Utility Final Inspection $50.00 $50.00 2/8/95 Water Meter (Domestic) $347.43 $347.43 2/8/95 Meter Deposit (Domestic) $105.00 $105.00 2/8/95 Water Meter (Fire&lrrig.) $2,551.65 $2,551.65 2/8/95 Meter Deposit (irrigation) $35.00 $35.00 Total Fees Fees Paid TOTALS $83,964.86 $83,964.86 DATE 2/14/95 2/14/95 3/31/95 2/14/95 6/12/95 5/18/95 5/18/95 5/18/95 5/18/95 5/18 & 8/5/95 5/18/95 Amount Owed $o.oo NOTES ~/plans 3/31/95 3/31/95 1/5/95 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. irrigation Plan Approved Erosion Control Maint.