Gulf Bearing-PT 950720Bore/Excavation in Public Right-Of-Way Perm{t
City of Coppe!! - Public Works Departmen~
Phone:
~mergenC~ Phone
RepresentLng:
Have ,~ii City and/or Franchise Utilities Been Contacted and
Existing utilities Located: YES
Will It Be Necessary to Excavate Street, A~ley or Sidewalk
9ave~aont? YES (ac~ach permit), NO
Representative(s) of the Franchlse/Centrac~or must adhere to all
construction s~andards approved by the Ciuy of Coppel!, which
includes but is not limited to: Compaction of Trenches and Bores,
and Barricading according to the Texas Manual on Uniform Traffic
Control Devices. Area(s) affected must be restored to as good
condition as before the commencement of work.
Any excavation requiring closing of a street or alley must be
reported to the Police, Fire, and Public Works Depa_~t_ments prior
to closing (.%62-1144, 462-1133 and 462-8495).
Attach Work Order (Franchise Only)
PAGE 2
PERMIT
A~ach Barricading/Detour
apgl£¢ab!e.
Plan if a
lane
£~
Represenua~ive
Franchise Inspector/or City inspecuor
i=/t ~:y Re~e~enna~ive
Dane ....
A=~!icanu shall indemnify and for~ver hold ha_--m.!ess againsu each
a~ eve~/ claim, demand ct'cause cf action that ma,/ be mad~ or come
against ~t by reason of or if any -way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the
a~p!icant under pe-~'m- ic from ~he City, if such perm. it is granted.
P Er~IT. PIIB
Ail contractors will contact Public Works @ 462-8495 to have
trenches and/or open cuts inspected prior to back fill operation
taking place. Staff will be sent to inspect the prqject.