Loading...
Jack In The Box-WO010117 WATER Phone ~b~m~). Al tv, x): Check for: Accuracy test: . Meter Leak: Initial meter relocation inspections Check water pressure: Re-read 1. Bacldlow Imm. 2. Reoair 3. Ma/menance Bacldlow Insp.. A. Main Line A. Pump Bldlow Cert. Date B. Valves B. Water Tower Re-Cert. Date C. Service Line C. Sampl~ D. Hydrants D. Equipment E. Safety 4. 0thor A. Line Locate B. Line Locate C. Tap D Excavation Reason for failure: A. Elect~olysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site i.f applicable: A. Barricades B. Cones C. Tape D. Lights E. Other 7. If Meter/Set,ice Leak: Classify: - City:. A. Water Loss (estimate): (3PM __ B. Was Water Metered: Yes C. Was Customer Notified: Verbally Fire plug flushing No Total Gallons Doorknocker - 8. If Meter Change Out: Vehicle/Equipment Used Unit # Miles l.-L's Equipment A. Old Meter # Reading B. New Meter # Reading C. Old Meter SizvaType: E. Type of work performed or t-mdings: D New Meter Size/Type. 9. If mainline or deq:} service r~pa/r, descn'be typ~ ofpip~ or service line and condition: 10. Man-hours: Crew Members. 11. List Matetiah Used: 12. IfTou had an accideng~ncident while peffom~g ~s request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many ~ps to do ts~k? Signature