Loading...
Hager Container-AG 880913 (2)I. REF/FILE NUMBE~ : Hager Container Addition - Preliminary Plat II. ITEM CAPTION : PUBLIC HEARING: To c,~ider approval of a preliminary nlat and consideration of certain variances, for the Hager Container Addition, located approximately lr000 feet from the southeast corner of Royal Lane and Thweatt Road, at the re~{uest of Ha~er Containers. III. ACTION RECOMMENDED : Date of pl~,,,,i,,o l~ ~'~i~o Meeti~a:,:. August 18~ 1988 rlo~i~inn n[ pin--inn_ & 7..,.i.._~ C~ ...... i..-.L...-' Approved (6-0) (See stipulations on attached minutes}. IV. REP. IN ATTENDANCE A: STAFF - TarvonB~wm~-P&ZC~rai~rs' B: OTHER - V. NOTIFICATION TO : Bill Anderson METHOD OF CONTACT : Letter DATE : 9-8-88 VI. FINANCIAL REVIEW : 1. BUDGETED ITEM : N/A YES 2. BUDGET AMOUNT : 3. ESTIMATED AMOUNT FOR THIS ITEM : 4. AMOUNT OVER OR UNDER BUDGET : 5. LOW BIDDER RECOMMENDED : SOURCE OF FUNDING CO'S OR BONDS FUNDS : (Series or. year authorized) : OPERATING BUDGET (Account Number) : OTHER : YES NO AGENDA REQUEST FORM DMEMOI APPROVED BY CITY MAnAGeR .{ ITEM NUHBER The City With A Beautiful Future CITY OF COPPELL PLAh~NING AND ZONING DEPARTMENT STAFF REPORT P O Box 478 Coppell. Texas 75019 214 - 462 - 0022 Date: August 18, 1988 PLANNING & ZONING DEPARTMENT RE: Case #: Hager Container Addition - PRELIMINARY PLAT LOCATION: Approximately 1,000 feet from the southeast corner of Royal Lane and Thweatt Road. REQUEST: Preliminary Plat approval and variances. APPLICANT: Rager Containers c/o Bill Anderson/Robert & Dowdy Engineers 16200 Dallas Parkway, Suite 100 Dallas, Texas 75248 GENERAL DESCRIPTION: Applicant is requesting approval of a preliminary plat to allow for the future construction of a container company. STAF~ ANALYSIS: (SEE ATTACHED) P O Box 478 Coppeil, Texas 75019 2~4 - 462 - 0022 }lAGER CONTAINER ADDITION - PRELIMINARY PLAT STAFF ANALYSI~ Several variances are being requested for this subdivision; they are as follows: VARIANCE #1: STAFF COMMENTS: Waiver of requirement of a full flow meter. The Public Works Department will be present at the meeting to discuss this issue. VARIANCE #2: STAFP CO}%MENTS: Assessment for water and sewer fees be limited to office area. The subdivision Ordinance requires that the fees for the water and sewer availability be calculated by the square footage of the entire building. VARIANCE #3: STAFF COM~TS: Request that requirement for landscaping be determined at the time of Building Permit. Staff has no objection to this request. VARIANCE #4: STAFF COMmeNTS: Request Water and Sewer Availability Fee be assessed (100%) at the time of Building Permit. No Comment. Subdivision Ordinance requires 50% due prior to final plat, and 50% at the time of Building Permit. VARIANCE #5: STAFF COMMENTS: Dedication of an addition 5 feet Right-of-Way width. Please see attached comments from Ginn, Inc. HAGER.ANALYSIS PZAGN2 GINN. INC. C(}NSULTING ENGINEERS MEMORANDUM Date: August 11, 1988 To: Taryon Bowman From: Kevin Peiffe~ Subject: Hager Containers Addition We have reviewed the preliminary/final plat and construction plans for the above referenced project. Per the sub-division ordinance and master thoroughfare plan, Royal Lane is classified as a major thoroughfare and thus requires a 110' right-of-way. A 100' right-of-way currently exists. As a result, the staff has requested an additional 5' of right-of-way to be dedicated along the frontage. This request will be made to all properties fronting Royal Lane as each property goes through the platting process. For your information, the reason the city requires 110' of right- of-way vs. 100' is to allow adequate width in the parkways for city utilities, other public utilities, sidewalks and landscape and irrigation. Experience has shown that this additional 5' greatly reduces the chance or need to ,'stack" utilities, etc. due to parkway width restrictions- The other comment we have is in regards to the construction plans. is re ired per the sub-division ordinance to be 6" The fire lane ' qu.. ~,, ~4--e stabilized subgrade. The of concrete (3000 psi} on ~_~ ~p~, ....... o~table alternative staff does not support crusned suone ~ ~,, ~ to this requirement. · Phone 214/248-2[900 1,10o Preslou Road · Suite 100 · LB 118 · Dallas, Texas 75248 COPPELL PUBLIC WORKS PIDIORAh~UI~ August 9, 1988 TO: FROM: RE: Planning & Zoning Department Public Works Departments Review of: Preliminary Hagar Containers Addition; Zoning Phillips Addition, Gifford Hill, Salernos Restaurant Hagar Containers Addition Variance 1 - Should adhere Details/Subdivision Ordinance. It is that all fire and domestic services be line which would appear to and at the same time adhere to The remaining variances, staff to Standard Construction staff's opinion, if possible, combined into one combination be cost effective for the developer the Standard Construction Details. feels will be at Council's descretion. August 22, 1988 MEMORANDL~ TO: FROM: RE: Larry Jackson, City Attorney ~rank Trando, D~e~uty City Manager Russell Doyl Engineer Platting Pro~ess and Fee Waiver Requests Attached is a copy of the two packets for the preliminary and final plats of the Hager Container Addition. Please respond by September 1, 1988 to Taryon Bowman providing your individual recommendations regarding the requested Variance ~2 and Variance ~4, regarding water and sewer availability fees and the waiver thereof, etc. Should staff recommend one way or the other, the change in calculating fees (variance ~2), reducing the yield of the fee regarding any finan- cial ramification (e.g. water and sewer rates determination and their dependency on fees collected, etc.), as well as any legal ramification since, as I understand, we are being challenged in the courts regarding fees of the past. If you have any questions, please do not hesitate calling either Taryon or myself. Thank you. RRD/lsg xc: (memos only) Steve Goram, Director of Public Works Taryon Bowman, P&Z Coordinator Alan Ratliff, City Manager Shohre Daneshmand, Civil Engineer FEES.HAGER MEMO1 August 23, 1988 TO: FROM: RE: Wayne Ginn,,~ Inc. Russell Doability Engineer R.O.W. Recommendation and Results on the Hager Plats Attached is the recommendation Ginn, Inc. gave on subject plat.. Kevin did a very good Job, and he and I discussed the matter at great length. While he may have provided appropriate responses, I am concerned for the integrity of the future and maintenance of the City's Transportation and Street Plans (Subdivision Ordinance, etc.). Specifically, if we have only ten (10) feet of Parkway and five (5) foot easement, will that confine us to a condition that is undesirable~ That is, when there are inlets and/or fire hydrants, et al in the parkway, will the pavement be protected from cutting by having enough R.O.W. for the utilities (theirs and ours)? Or will we sometime in the future on these narrower R.O.W.'s, have to let utilities occupy either the medians or the corridor under our pavements? Also note when Cities build right turn lanes, sometimes additional R.O.W. is needed at a higher cost than when platting, etc. If your consideration would produce anything other than what has trans- pired to-date, then written comments should be forwarded to Taryon Bowman on or before September 1, 1988, so that it will be timely for advise to the City Council on the Hager Plats. Thank you. RRD/lsg attachment xc: Kevin Peiffer, Ginn, Inc. Shohre Daneshmand, Civil Engineer Taryon Bowman, P&Z Coordinator Alan Ratliff, City Manager ROW.HAGER MEMO1 CONSULTING ENGINEERS Date: To: From: Subject: ausust lSSS A','' Taryon Bowman Kevin Peiffe~ Hager Containers Addition We have reviewed the preliminary/final plat and construction plans for the above referenced project. · . · dinance and master thoroughfare plan, Per the sub-division or ~ ~h~rou~hfare and thus al Lane is classified as a ma3u&, ~-i- t ~f wa currently Roy . , · ~o~-wa . A 100 rlgh - - .Y' ' of requ}res ~_ ~l~esU~h k~f has requested an additional 5 right-of-way to be dedicated along the frontage- This request will be made to all properties fronting Royal Lane as each property goes through the platting process. For your information, the reason the City requires 110' of right- of-way vs. 100' is to allow adequate width in the parkways for City utilities, other public utilities, sidewalks and landscape and irrigation. Experience has shown that this additional 5' greatly reduces the chance or need to ,'stack" utilities, etc. due to parkway width restrictions- plans. e sub-division ordinance to be 6" The other comment we have is in regards to the construction The fire lane is required per t~ . · a 6 lime stabilized ~ubgrade. The of concrete (3000 psi) on ~ = ~ a~ an acceptable alternative s-aff does not support crusneu ~ ..... to this requirement. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Minutes of August 18, i988 Planning & Zoning Commission Page 4 Following discussion, Commissioner Weaver moved to approve Case #S-1034 with all variances. Commissioner Thomas seconded the motion; motion carried (6-0) with Chairman Munsch and Commissioners Green, Johnson, Thomas, Tunnell and Weaver voting in favor of the motion. PLATTING Item 10: To consider approval of a preliminary plat for Hater Container Addition, located approximately 1,000 feet from the southeast corner of Royal Lane and Thweatt Road, at the request of Hater Containers. Taryon Bowman introduced the item to the Commission. Mr. Bill Anderson of Roberts and Dowdy Engineers was present to represent this item. Mr. Anderson stated that he is representing the owner of the property, Connell Development. Following discussion, Commissioner Green moved to approve the preliminary plat for the Hager Addition with variances three (3) and five (5) included, with a recommendation to the City Council that further input from City staff be considered for variances one (1), two (2) and four (4), as stated on the Staff Report of August 18, 1988. Item 11: To consider approval of a final plat for Hager Container Addition, located approximately 1,000 feet from the southeast corner of Royal Lane and Thweatt Road, at the request of Hager Containers. Taryon Bowman introduced the item to the Commission. Mrs. Bowman stated that if this final plat is approved, staff would request that it be stated with the stipulation that the construction plans be approved by the City Engineer. Again, Mr. Bill Anderson was present to represent this item. Following discussion, Commissioner Tunnell moved to approve the final plat for the Hager Container Addition with variances three (3) and five (5); and that variance one (1) be worked out to the satisfaction of the City staff. Commissioner Weaver seconded the motion; motion carried (6-1) with Chairman Munsch and Commissioners Green, Johnson, Thomas, Tunnell and Weaver voting in favor of the motion. Item 12: Discussion of re-appointment of Board Members. Chairman Munsch stated that all Board Members who are up for re-appointment, and who are planning to re-apply, must submit their applications to the City Secretary's Office by Monday, September 19, 1988. Septen~ber 7, Memorandum From: Subject: 1988 Russell Doyle, City Engineer Frank Trando Finance Director/Deputy City Manager~ Platting Process and Fee Waiver Requests by Hager Container As you are aware, the way that the water and sewer availability fees are caLcuLated is covered in section XVI (B) of our subdivision ordinance. No distinction is made between office space versus total building space. Therefore, the fee should be calculated on the total square footage of the building. Regarding the collection of the fees, I believe that they should be collected in the manner specified under the subdivision ordinance. ?Tilt COPPELL PUBLIC WORKS September 9, 1988 TO: Taryon Bowman, Planning & Zoning Coordinator FROM: Howard Pafford, Water Foreman Per Birdsall, Street Foreman Richard Diano, Park Foreman Steve Morton, Public Works Inspector Dana Kamp, Sign/Signalization Technician RE: Hager Containers We have reviewed the above referenced development plans along with the Director of Public Works and have determined that Staff has no objection to this development, including those variances requested. Below are comments and 2 fee calculations; one based on 98,000 square feet, the other 8,000 square feet. The 8,000 square feet only representS the office area. Water Availability Fee on 98,000 sq.ft. 50% due at Final Plat 50% due at Building Permit Sewer Availability Fee on 98,000 sq.ft. 50% due at Final Plat 50% due at Building Permit $1470.00 $1470.00 $1470.00 $1470.00 Water Tap Fees on 4 meters 100% due at Final Plat Water Availability Fee on 8,000 sq.ft. 50% due at Final Plat 50% due at Building Permit Sewer Availability Fee on 8,000 50% due at Final Plat 50% due at Building Permit sq.ft. $400.00 $240.00 $240.00 $240.00 $240.00 Water Tap Fees on 3 meters $300.00 100% due at Final Plat Staff met with Bill Anderson, Engineer for Hager Containers, to discuss the City's requirement for full flow meters on private fire lines. After reviewing Mr. Anderson's proposal for 1 - 10" line for service of closed and open fire protection at this site, staff was in agreement with the proposed meter setting (DDC II). The sprinkler system inside the building will be a closed system. In the event water is used from the sprinkler system, an alarm will sound at the Fire Station. All fire hydrants on site will be equipped with Hydra-Storz connections at the expense of the developer. This type of connection greatly restricts unauthorized use of fire hydrants. HLP/PHB/RED/SMM/DFK/sm cc: Steve Goram, Director of Public Works