Loading...
Hager Container-CS 881017/~ The C t.v W th A Beautiful Future October 17, 1988 OCT 2 0 1988 CITY MANAGER Hr, Ted Hager 12855 Valley Branch Lane Dallas, Texas 75234 RE: Baser Container Addition - Final Plat Dear Hr. Haser: P.O. Box 478~ Coppell. Texas~,5019 214 - 462. - ~22 ~ This letter is to inform you that your request for applications of a prelininary and final plat for the Hager Container Addition, were approved with variances by the City Council of the City of Coppe11 on September 13, 1988. The stipulations for approval are as follows: "... placin$ a buildin$ line restriction on the north side of the property of thrity-six (36) feet." The approved variances are as follows: Request that a full flow water meter not be required on the water line that is to be used exclusively for fire service requirements, 2. Request that the assessment for water and sewer fees. be limited to the office area of the building for calculating associated fees. 3. Request that the requirements for landscaping, which affect this tract, both conceptual and detailed, be determined upon submittal of a Building Permit Request. Request chat the water and sever availability fee be assessed (1002) at the time of a BuildinK Permit Request. For fee calculations, ye request that the area of "variance request No. 2' be used to determine the associated cost. 0 Request that the dedication of an additional 5 ft. right-of-way width, to the total 100 ft. right-of-way width, be in the form of a 5 ft. utility easement, Request that we be alloyed to construct a main buildins and accessory buildinE in excess of 72,00 square feet, permittinE B-2 occupancy, type IIl~ conatructio~o~,A~v~ as MAYOR AND COUNCIL DATE: / defined does not exceed the 2:1 Floor to Area Ration set per the current Zoning Ordinance. Note a letter fro~ the Building Official on September 7, 1988, for more specific conditions and concnrrance, In reference to variance ~2 and ~4, the associated fees based upon an o£fice area of 8,000 square feet, is a total of $480.00. This total amount will be due at the same time at which your building fees are assessed. We received a payment of $300.00 for three (3) water tape on October 14, 1988. Additionally, the Coppell Subdivision Ordinance, Section XVI, E, states "The developer shall pay a Construction Per. it Fee to the City to compensate for the cost of construction review and inspections". This ~unt is equal to 100I of the filing fee for the final plat, which based on the final plat fee, is $263.56. Again I would like to welcome the Hager Container Company to Coppell, and we look foruard to working with you in the near future. Please contact me at (214) 462-0022 should you have any questions. Sincerely, P&Z Coordinator TB/lsg XC: Alan Ratliff, City Manager Russell R. Doyle, P.E., City Engineer Dale Jackson, Building Official Howard Pafford, Public Works Bill Anderson, Roberts Dowdy (w/fee receipts) HAGER. FINAL ~O1