Loading...
Hager Container-CS 880909COPPELL PUBLIC ~OR~S September 9, 1988 TO: FROM: RE: Taryon Bowman, Planning & Zoning Coordinator Howard Pafford, Water Foreman Per Birdsall, Street Foreman Richard Diano, Park Foreman Steve Morton, Public Works Inspector Dana Kamp, Sign/Signalization Technician Hager Containers We have reviewed the above referenced development plans along with the Director of Public Works and have determined that Staff has no objection to this development, including those variances requested. Below are comments and 2 fee calculations; one based on 98,000 square feet, the other 8,000 square feet. The 8,000 square feet only represents the office area. Water Availability Fee on 98,000 50% due at Final Plat 50% due at Building Permiti sq.ft. $1470.00 $1470.00 Sewer Availability Fee on 98,000 50% due at Final Plat 50% due at Building Permit sq.ft. $1470.00 $1470.00 Water Tap Fees on 4 meters 100% due at Final Plat $400.00 Water Availability Fee on 8,000 50% due at Final Plat 50% due at Building Permit sq.ft. $240.00 $240.00 Sewer Availability Fee on 8,000 50% due at Final Plat 50% due at Building Permit sq.ft. $240.00 $240.00 Water Tap Fees on 3 meters 100% due at Final Plat $300.00 ~Staff met with Bill Anderson, Engineer for Hager Containers, to discuss the City's requirement for full flow meters on private fire lines. After reviewing Mr. Anderson's proposal for 1 - 10" line for service of closed and open fire protection at this site, staff was in agreement with the proposed meter setting (DDC II). The sprinkler system inside the building will be a closed system. In the event water is used from the sprinkler system, an alarm will sound at the Fire Station. All fire hydrants on site will be equipped with Hydra-Storz connections at the expense of the developer. This type of connection greatly restricts unauthorized use of fire hydrants. HLP/PHB/RED/SMM/DFK/sm cc: Steve Goram, Director of Public Works